Timed event graph-based cyclic reconfigurable flow shop modelling and optimization
文献类型:期刊论文
作者 | Ren, S. C.; Xu, D.![]() ![]() |
刊名 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
![]() |
出版日期 | 2007 |
卷号 | 45期号:1页码:143-156 |
关键词 | reconfigurable manufacturing system configuration module flow shop timed event graph modelling |
英文摘要 | The manufacturing process of a part involves sequential steps and each step could be viewed as the part being manufactured by a process module with some specific function. The module must be placed on a machine and connected to the machine via standard interfaces. The machine considered here is a carrier or general platform that can hold one or several different modules simultaneously. Based on the idea that modules are independent of machines and different combinations of modules and machines result in different configurations, the cyclic reconfigurable flow shop is proposed for the new manufacturing paradigm - Reconfigurable Manufacturing System (RMS). The cyclic reconfigurable flow shop can be modelled as a timed event graph. Different cases of cyclic reconfigurable flow shops are discussed and the optimal configuration can be obtained by solving the corresponding mixed-integer program derived from the timed event graph model. |
WOS标题词 | Science & Technology ; Technology |
类目[WOS] | Engineering, Industrial ; Engineering, Manufacturing ; Operations Research & Management Science |
研究领域[WOS] | Engineering ; Operations Research & Management Science |
关键词[WOS] | ANALYTICAL HIERARCHICAL PROCESS ; MANUFACTURING SYSTEMS RMSS ; MODULAR LOGIC CONTROLLERS ; PERFORMANCE EVALUATION ; PETRI NETS ; STOCHASTIC-MODEL ; MACHINING SYSTEMS ; OPTIMAL SELECTION ; MARKED GRAPHS ; DESIGN |
收录类别 | SCI |
语种 | 英语 |
WOS记录号 | WOS:000242019100007 |
源URL | [http://ir.ia.ac.cn/handle/173211/9430] ![]() |
专题 | 自动化研究所_09年以前成果 |
作者单位 | 1.Chinese Acad Sci, Inst Automat, Beijing 100080, Peoples R China 2.Tsinghua Univ, Dept Automat, Beijing 100084, Peoples R China |
推荐引用方式 GB/T 7714 | Ren, S. C.,Xu, D.,Wang, F.,et al. Timed event graph-based cyclic reconfigurable flow shop modelling and optimization[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2007,45(1):143-156. |
APA | Ren, S. C.,Xu, D.,Wang, F.,&Tan, M..(2007).Timed event graph-based cyclic reconfigurable flow shop modelling and optimization.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,45(1),143-156. |
MLA | Ren, S. C.,et al."Timed event graph-based cyclic reconfigurable flow shop modelling and optimization".INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 45.1(2007):143-156. |
入库方式: OAI收割
来源:自动化研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。