Beam dynamics studies on BEPCII storage rings at the commissioning stage
文献类型:期刊论文
作者 | Qin Q(秦庆)![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
刊名 | 中国物理C
![]() |
出版日期 | 2009 |
期号 | S2页码:65-70 |
关键词 | BEPCⅡ commissioning beam dynamics luminosity |
通讯作者 | 秦庆 |
英文摘要 | During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 ... |
公开日期 | 2016-02-25 |
源URL | [http://ir.ihep.ac.cn/handle/311005/217026] ![]() |
专题 | 高能物理研究所_加速器中心 高能同步辐射光源 |
推荐引用方式 GB/T 7714 | Qin Q,Huang N,Liu WB,et al. Beam dynamics studies on BEPCII storage rings at the commissioning stage[J]. 中国物理C,2009(S2):65-70. |
APA | 秦庆.,黄楠.,刘渭滨.,刘瑜冬.,彭月梅.,...&周德民.(2009).Beam dynamics studies on BEPCII storage rings at the commissioning stage.中国物理C(S2),65-70. |
MLA | 秦庆,et al."Beam dynamics studies on BEPCII storage rings at the commissioning stage".中国物理C .S2(2009):65-70. |
入库方式: OAI收割
来源:高能物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。