Design and construction of the first prototype ionization chamber for CSNS and PA beam loss monitor (BLM) system
文献类型:期刊论文
作者 | Xu MH(徐美杭)![]() ![]() ![]() ![]() |
刊名 | 中国物理C
![]() |
出版日期 | 2009 |
期号 | 2页码:123-126 |
关键词 | spallation neutron source proton accelerator beam loss monitor ionization chamber plateau curve linearity |
通讯作者 | 徐美杭 |
英文摘要 | Design and construction of the first prototype ionization chamber for CSNS and Proton Accelerator (PA) beam loss monitor (BLM) system is reported. The low leakage current ( |
公开日期 | 2016-02-26 |
源URL | [http://ir.ihep.ac.cn/handle/311005/219324] ![]() |
专题 | 高能物理研究所_实验物理中心 高能物理研究所_加速器中心 中国科学院高能物理研究所_中国散裂中子源 |
推荐引用方式 GB/T 7714 | Xu MH,Tian JM,Chen C,et al. Design and construction of the first prototype ionization chamber for CSNS and PA beam loss monitor (BLM) system[J]. 中国物理C,2009(2):123-126. |
APA | 徐美杭,田建民,陈昌,陈元柏,徐韬光,&陆双桐.(2009).Design and construction of the first prototype ionization chamber for CSNS and PA beam loss monitor (BLM) system.中国物理C(2),123-126. |
MLA | 徐美杭,et al."Design and construction of the first prototype ionization chamber for CSNS and PA beam loss monitor (BLM) system".中国物理C .2(2009):123-126. |
入库方式: OAI收割
来源:高能物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。