中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Installation and cosmic ray test of the high voltage system of the BESIIIdrift chamber

文献类型:期刊论文

作者Xu MH(徐美杭); Chen C(陈昌); Chen YB(陈元柏); Wu Z(吴智); Qin ZH(秦中华); Wu LH(伍灵慧); Liu JB(刘建北); Wang L(王岚); Jin Y(金艳); Liu RG(刘荣光)
刊名中国物理C
出版日期2008
期号12页码:992-994
关键词BESⅢ drift chamber high voltage system cosmic ray test installation
通讯作者徐美杭
英文摘要After examination of the designed high voltage power supply system of the BESⅢ drift chamber in the beam test of the full length prototype of drift chamber, a full system covering all the channels of high voltage was installed. The system’s training and the high voltage value adjustment were carried...
公开日期2016-02-26
源URL[http://ir.ihep.ac.cn/handle/311005/219387]  
专题高能物理研究所_实验物理中心
推荐引用方式
GB/T 7714
Xu MH,Chen C,Chen YB,et al. Installation and cosmic ray test of the high voltage system of the BESIIIdrift chamber[J]. 中国物理C,2008(12):992-994.
APA 徐美杭.,陈昌.,陈元柏.,吴智.,秦中华.,...&黄杰.(2008).Installation and cosmic ray test of the high voltage system of the BESIIIdrift chamber.中国物理C(12),992-994.
MLA 徐美杭,et al."Installation and cosmic ray test of the high voltage system of the BESIIIdrift chamber".中国物理C .12(2008):992-994.

入库方式: OAI收割

来源:高能物理研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。