泥石流堰塞湖影响区域评估及其应急预案
文献类型:期刊论文
作者 | 刘晶晶1![]() ![]() |
刊名 | 南水北调与水利科技
![]() |
出版日期 | 2015-10 |
卷号 | 13期号:5页码:935-940 |
关键词 | 泥石流 堰塞湖 溃决洪水 影响区域 应急预案 |
ISSN号 | 1672-1683 |
其他题名 | Assessment of influence area and emergency plan for debris-flow dammed lake-A case study in Mozi Gully of Wenchuan,Sichuan |
通讯作者 | 刘晶晶 |
英文摘要 | After the 5.12 earthquake, a large number of new or old debris-flow gullies increased their activity and the possibility of dammed lake formed by debris flow increased also. The dam, which make up of debris flow, is less stable. There are only a few hours from the dam formation to outburst. So it is hard to do man-made engineering intervention. The establishment of emergency plans is a necessary and effective way to disaster reduction. In this paper, the Mozi Gully is chosen to be a typical area. The principles and preparation methods of emergency plans are put forward for Mozi Gully. Firstly, the potential peak flow, flooding height and outburst duration should be determined. Secondly, on a field survey, the inundation area is circled and risk population is estimated. According to terrain conditions, possible escape route and aftercare locations are chosen. Finally, combining with governmental administrative arrangements, the notification procedures, security measures and time node of start and end are set. The emergency plan for Mozi Gully lay the foundation for the future other dangerous debris-flow gullies and improve the efficiency of respond of debris-flow dammed Lake. |
收录类别 | CSCD ; 北大中文核心 |
语种 | 中文 |
CSCD记录号 | CSCD:5536172 |
源URL | [http://ir.imde.ac.cn/handle/131551/13955] ![]() |
专题 | 成都山地灾害与环境研究所_山地灾害与地表过程重点实验室 |
作者单位 | 1.中国科学院水利部成都山地灾害与环境研究所 2.西南石油大学土木工程与建筑学院 |
推荐引用方式 GB/T 7714 | 刘晶晶,孙正超,程尊兰. 泥石流堰塞湖影响区域评估及其应急预案[J]. 南水北调与水利科技,2015,13(5):935-940. |
APA | 刘晶晶,孙正超,&程尊兰.(2015).泥石流堰塞湖影响区域评估及其应急预案.南水北调与水利科技,13(5),935-940. |
MLA | 刘晶晶,et al."泥石流堰塞湖影响区域评估及其应急预案".南水北调与水利科技 13.5(2015):935-940. |
入库方式: OAI收割
来源:成都山地灾害与环境研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。