Development Progress of Critical Equipment in the CSNS Cryogenic Hydrogen System.
文献类型:期刊论文
作者 | Wang GP(王国平)![]() ![]() ![]() ![]() ![]() ![]() ![]() |
刊名 | Physics Procedia
![]() |
出版日期 | 2015 |
卷号 | 67页码:233-238 |
通讯作者 | 王国平 |
英文摘要 | Most of the cryogenic hydrogen apparatuses in the CSNS hydrogen system are non-std. equipment, and will be developed independently. This paper introduces the latest research progress. Manufg. of the accumulator has been completed in Feb. 2014. A prototype of the hydrogen-helium heat exchanger has been manufd. and tested for sealing. The manuf. of the cryogenic hydrogen heater and the ortho-para hydrogen converter will be finished soon. These cryogenic devices will be integrated into the hydrogen cold box and the accumulator cold box. The engineering design of the cold boxes was completed, and the vessel of the hydrogen cold box has been manufd. [on SciFinder(R)] |
收录类别 | EI ; CA |
公开日期 | 2016-05-03 |
源URL | [http://ir.ihep.ac.cn/handle/311005/228870] ![]() |
专题 | 高能物理研究所_东莞分部 高能物理研究所_实验物理中心 高能物理研究所_加速器中心 中国科学院高能物理研究所_中国散裂中子源 |
推荐引用方式 GB/T 7714 | Wang GP,Zhang Y,He CC,et al. Development Progress of Critical Equipment in the CSNS Cryogenic Hydrogen System.[J]. Physics Procedia,2015,67:233-238. |
APA | 王国平.,张玙.,何崇超.,丁美莹.,王雅琼.,...&K..(2015).Development Progress of Critical Equipment in the CSNS Cryogenic Hydrogen System..Physics Procedia,67,233-238. |
MLA | 王国平,et al."Development Progress of Critical Equipment in the CSNS Cryogenic Hydrogen System.".Physics Procedia 67(2015):233-238. |
入库方式: OAI收割
来源:高能物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。