a drum-buffer-rope based scheduling method for semiconductor manufacturing system
文献类型:会议论文
作者 | Cao Zhengcai ; Peng Yazhen ; Wang Yongji |
出版日期 | 2011 |
会议名称 | 2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011 |
会议日期 | August 24, |
会议地点 | Trieste, Italy |
关键词 | Customer satisfaction Rope Scheduling Semiconductor device manufacture |
页码 | 120-125 |
中文摘要 | Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE. |
英文摘要 | Scheduling in semiconductor manufacturing system is an important task for the industries faced with a large amount of resource competitions. Effective scheduling can improve the overall system performance and customer satisfaction. In this paper, a scheduling method with the core of bottleneck equipment control is designed referring to Drum-Buffer-Rope (DBR) theory. In order to identify the main-bottleneck, the relative load which takes the feature of reentrance into consideration is applied. For the avoidance of local blocking, the management of sub-bottleneck is presented. As both releasing and dispatching are taken into account, a scheduling method based on the compound priority is formed. Finally, HP-24 semiconductor wafer fabrication is used as an example to demonstrate the effectiveness of the proposed method. © 2011 IEEE. |
收录类别 | EI |
会议主办者 | Ansaldo Sistemi Industriali - Results to the Power of Three |
会议录 | IEEE International Conference on Automation Science and Engineering
![]() |
语种 | 英语 |
ISSN号 | 2161-8070 |
ISBN号 | 9781457717307 |
源URL | [http://ir.iscas.ac.cn/handle/311060/16217] ![]() |
专题 | 软件研究所_软件所图书馆_会议论文 |
推荐引用方式 GB/T 7714 | Cao Zhengcai,Peng Yazhen,Wang Yongji. a drum-buffer-rope based scheduling method for semiconductor manufacturing system[C]. 见:2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011. Trieste, Italy. August 24,. |
入库方式: OAI收割
来源:软件研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。