Unreliable production-inventory model with a two-phase Erlang demand arrival process
文献类型:期刊论文
作者 | Wang, JT; Cao, JH; Liu, B![]() |
刊名 | COMPUTERS & MATHEMATICS WITH APPLICATIONS
![]() |
出版日期 | 2002 |
卷号 | 43期号:1-2页码:1-13 |
关键词 | production-inventory system Erlang demand arrival process unreliable machine |
ISSN号 | 0898-1221 |
英文摘要 | A production-inventory system is studied in which an unreliable machine is susceptible to failure following which it must be repaired to make it operative again. The demand for the product is governed by a two-phase Erlang process and demand sizes are independent and identically distributed random variables. A two-critical-number policy (m, M) is used to control a machine's setups and shutdowns, namely, the machine is shut down whenever the inventory level reaches M, and is resumed to operate only when the inventory level falls below the critical number M (m less than or equal to M). We obtain the steady-state distribution of the inventory process and some performance measures of the process. (C) 2001 Elsevier Science Ltd. All rights reserved. |
WOS研究方向 | Mathematics |
语种 | 英语 |
WOS记录号 | WOS:000173106600001 |
出版者 | PERGAMON-ELSEVIER SCIENCE LTD |
源URL | [http://ir.amss.ac.cn/handle/2S8OKBNM/17219] ![]() |
专题 | 系统科学研究所 |
通讯作者 | Wang, JT |
作者单位 | Chinese Acad Sci, Acad Math & Syst Sci, Inst Appl Math, Beijing 100080, Peoples R China |
推荐引用方式 GB/T 7714 | Wang, JT,Cao, JH,Liu, B. Unreliable production-inventory model with a two-phase Erlang demand arrival process[J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS,2002,43(1-2):1-13. |
APA | Wang, JT,Cao, JH,&Liu, B.(2002).Unreliable production-inventory model with a two-phase Erlang demand arrival process.COMPUTERS & MATHEMATICS WITH APPLICATIONS,43(1-2),1-13. |
MLA | Wang, JT,et al."Unreliable production-inventory model with a two-phase Erlang demand arrival process".COMPUTERS & MATHEMATICS WITH APPLICATIONS 43.1-2(2002):1-13. |
入库方式: OAI收割
来源:数学与系统科学研究院
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。