A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels
文献类型:期刊论文
作者 | Chen, Dong-Fang2; Liu, Guo-Feng1; Feng, Xia-Ting1![]() |
刊名 | ROCK MECHANICS AND ROCK ENGINEERING
![]() |
出版日期 | 2016 |
卷号 | 49期号:8页码:3257-3279 |
关键词 | Rockburst Microseismic monitoring Consequences Risk management Tunnels Jinping II hydropower station |
ISSN号 | 0723-2632 |
DOI | 10.1007/s00603-016-0949-5 |
英文摘要 | Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900-2525 m (with a length of 11.6 km in total for D&B tunnels). |
WOS研究方向 | Engineering ; Geology |
语种 | 英语 |
WOS记录号 | WOS:000381218100019 |
出版者 | SPRINGER WIEN |
源URL | [http://119.78.100.198/handle/2S6PX9GI/3901] ![]() |
专题 | 岩土力学所知识全产出_期刊论文 岩土力学所知识全产出 国家重点实验室知识产出_期刊论文 |
作者单位 | 1.Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn ; 2.Northeastern Univ, Minist Educ Safe Min Deep Met Mines, Key Lab |
推荐引用方式 GB/T 7714 | Chen, Dong-Fang,Liu, Guo-Feng,Feng, Xia-Ting,et al. A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels[J]. ROCK MECHANICS AND ROCK ENGINEERING,2016,49(8):3257-3279. |
APA | Chen, Dong-Fang,Liu, Guo-Feng,Feng, Xia-Ting,Feng, Guang-Liang,Chen, Bing-Rui,&Duan, Shu-Qian.(2016).A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels.ROCK MECHANICS AND ROCK ENGINEERING,49(8),3257-3279. |
MLA | Chen, Dong-Fang,et al."A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels".ROCK MECHANICS AND ROCK ENGINEERING 49.8(2016):3257-3279. |