中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Groundwater control and curtain grouting for tunnel construction in completely weathered granite

文献类型:期刊论文

作者Liu, Jinquan1,2; Chen, Weizhong1,3; Yuan, Jingqiang1; Li, Changjun1,2; Zhang, Qingyan1,2; Li, Xiaofei1,2
刊名BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT
出版日期2018
卷号77期号:2页码:515-531
关键词Curtain grouting thickness Seepage-erosion Water inrush model Completely weathered granite
ISSN号1435-9529
DOI10.1007/s10064-017-1003-x
英文摘要During tunnel construction, groundwater inrush from completely weathered granite strata is a significant challenge to geotechnical engineers. Up to the present, prevention of water inrushing hazards is almost exclusively based on the experience of engineers. This paper presents a coupled seepage-erosion water inrush model to investigate the characteristics of seepage-erosion properties. The proposed model is based on classical theories of solute transport and fluid dynamics in porous media. In the model, changes of porosity link permeability with the accumulation of particle loss in the seepage-erosion process. The coupled seepage-erosion model was applied to examine the influence of curtain grouting thickness on the seepage-erosion process. The results showed that the seepage-erosion process was attenuated as thickness increased. The results also showed that the porosity and permeability visibly changed and the water inflow clearly exceeded the acceptable engineering criterion when the thickness was less than 6 m. However, with a further increase in thickness, the seepage-erosion process was suppressed and little changes of the relative parameters were showed. The numerical results demonstrated that a curtain grouting thickness of 6 m was suitable for curtain grouting in completely weathered granite. Field investigation of Cenxi tunnel verified the effectiveness of the thickness determined by the proposed model.
WOS研究方向Engineering ; Geology
语种英语
WOS记录号WOS:000431300600004
出版者SPRINGER HEIDELBERG
源URL[http://119.78.100.198/handle/2S6PX9GI/4267]  
专题岩土力学所知识全产出_期刊论文
国家重点实验室知识产出_期刊论文
作者单位1.Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn ;
2.Univ Chinese Acad Sci ;
3.Shandong Univ, Geotech & Struct Engn Res Ctr
推荐引用方式
GB/T 7714
Liu, Jinquan,Chen, Weizhong,Yuan, Jingqiang,et al. Groundwater control and curtain grouting for tunnel construction in completely weathered granite[J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT,2018,77(2):515-531.
APA Liu, Jinquan,Chen, Weizhong,Yuan, Jingqiang,Li, Changjun,Zhang, Qingyan,&Li, Xiaofei.(2018).Groundwater control and curtain grouting for tunnel construction in completely weathered granite.BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT,77(2),515-531.
MLA Liu, Jinquan,et al."Groundwater control and curtain grouting for tunnel construction in completely weathered granite".BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT 77.2(2018):515-531.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。