中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Study on the Evaluation Method of Subgrade Settlement Caused by Structure Layer of the High-Speed Railway

文献类型:会议论文

作者Jiang, Lingfa; Xiong, Shudan; Xu, Xichang; Chen, Shanxiong
出版日期2012
会议日期SEP 15-16, 2012
会议地点Hong Kong, PEOPLES R CHINA
关键词evaluation method numerical simulation subgrade settlement high-speed railway structure layer
卷号188
DOI10.4028/www.scientific.net/AMM.188.72
页码72-77
英文摘要Based to the geometric and mechanical parameters of the typical high-speed railway, the settlement values on the foundation and the subgrade face with different structure layer load are obtained by the numerical calculation. According to these numerical results, the power functional relationship between S-st/S-infinity and P-st/h gamma is found, and a new evaluation method of the subgrade face settlement caused by the structure layer using the measure data is put forward. Through analyzing the settlement data of different conditions, the parameters of the formula are discussed, and some conclusions and suggestions are given. This new evaluation method will provide some reference for the design and the evaluation of the subgrade settlement caused by the structure layer of the high-speed railway.
源文献作者Xie, L
会议录APPLIED MECHANICS AND CIVIL ENGINEERING II
会议录出版者TRANS TECH PUBLICATIONS LTD
会议录出版地STAFA-ZURICH
语种英语
WOS研究方向Engineering ; Mechanics
WOS记录号WOS:000310935900013
源URL[http://119.78.100.198/handle/2S6PX9GI/4682]  
专题岩土力学所知识全产出_会议论文
国家重点实验室知识产出_会议论文
作者单位Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn
推荐引用方式
GB/T 7714
Jiang, Lingfa,Xiong, Shudan,Xu, Xichang,et al. Study on the Evaluation Method of Subgrade Settlement Caused by Structure Layer of the High-Speed Railway[C]. 见:. Hong Kong, PEOPLES R CHINA. SEP 15-16, 2012.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。