The Application of the Creep Model in the High-Speed Railway Subgrade Settlement Prediction Techniques
文献类型:会议论文
作者 | Li, Jian; Chen, Shan-Xiong; Yu, Fei |
出版日期 | 2013 |
会议日期 | AUG 24-25, 2013 |
会议地点 | Dalian, PEOPLES R CHINA |
关键词 | creep model post-construction settlement settlement prediction numerical simulation |
卷号 | 423-426 |
DOI | 10.4028/www.scientific.net/AMM.423-426.1253 |
页码 | 1253 |
英文摘要 | Settlement prediction is an important method to judge whether the post-construction settlement of the high-speed railway foundation satisfies the requirement of the standard. The paper uses the numerical calculating method based on creep model to predict the subgrade post-construction settlement of the surcharge preloading processing segment of the high-speed railway through inversing the creep parameters, and does comparative analysis with the more researched function fitting methods. The conclusion is that: (1) the numerical calculating method based on creep model is feasible to predict the post-construction settlement; (2) the method can predict the settlement trend with any time starting point; (3) the method can predict the settlement with relatively less actually measured data so as to saving project cycle. |
源文献作者 | Zheng, L ; Skuroda, S ; Liu, H ; Du, B ; Wei, J ; Zhao, Y |
会议录 | APPLIED MATERIALS AND TECHNOLOGIES FOR MODERN MANUFACTURING, PTS 1-4
![]() |
会议录出版者 | TRANS TECH PUBLICATIONS LTD |
会议录出版地 | DURNTEN-ZURICH |
语种 | 英语 |
WOS研究方向 | Engineering ; Materials Science ; Mechanics |
WOS记录号 | WOS:000339363800254 |
源URL | [http://119.78.100.198/handle/2S6PX9GI/4745] ![]() |
专题 | 岩土力学所知识全产出_会议论文 国家重点实验室知识产出_会议论文 |
作者单位 | Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn |
推荐引用方式 GB/T 7714 | Li, Jian,Chen, Shan-Xiong,Yu, Fei. The Application of the Creep Model in the High-Speed Railway Subgrade Settlement Prediction Techniques[C]. 见:. Dalian, PEOPLES R CHINA. AUG 24-25, 2013. |
入库方式: OAI收割
来源:武汉岩土力学研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。