中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
黄土高原地区淤地坝存在问题分析

文献类型:期刊论文

作者高照良 ; 杨世伟
刊名水土保持通报
出版日期1999
期号6页码:16-19
其他题名Existing Problems of Silt Arresters on the Loess Plateau
合作状况其它
中文摘要黄土高原地区自建国以来共建淤地坝1 .0 ×105 余座,淤地3 .8 ×105 hm 2 ,对黄土高原水土保持世界银行贷款项目区淤地坝的普查,充分证明了淤地坝在黄土高原水土保持上的作用以及经济和社会效益。但是,淤地坝建设与利用过程中仍存在种种问题,尤其表现在坝系规划布局不合理,病险坝多;设计标准偏低,易造成坝体破坏或垮坝;建坝施工质量差,工程不配套;坝体管理水平差,维护粗放;坝地利用率及经济效益偏低等5 个方面。
英文摘要There are 100 000 silt arresters(SA) and 381 300 hm 2 farmlands on the loess plateau that have been built since 1949. The widespread investigation showed that these SA have high effect of economic and social benefit on the soil and water conservation there. However, there were many problems in the SA construction and utilization, it especially showed at five aspects as follows: (1) The distribution of SA system are almost irrational and more weak and dangerous building. (2) Because of the low designing sta...
语种中文
公开日期2010-12-01
源URL[http://ir.iswc.ac.cn/handle/361005/2860]  
专题水土保持研究所_水保所知识产出(1956-2013)
推荐引用方式
GB/T 7714
高照良,杨世伟. 黄土高原地区淤地坝存在问题分析[J]. 水土保持通报,1999(6):16-19.
APA 高照良,&杨世伟.(1999).黄土高原地区淤地坝存在问题分析.水土保持通报(6),16-19.
MLA 高照良,et al."黄土高原地区淤地坝存在问题分析".水土保持通报 .6(1999):16-19.

入库方式: OAI收割

来源:水土保持研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。