Performance of North Anchorage Excavation of Fuma Yangtze River Bridge in Wanzhou, China
文献类型:期刊论文
作者 | Ran, T.1,2; Dai, F. C.3; Mei, S. H.4; Wang, W. W.5; Tan, L. H.5 |
刊名 | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES |
出版日期 | 2019-06-01 |
卷号 | 33期号:3页码:11 |
ISSN号 | 0887-3828 |
关键词 | Anchorage excavation Ground movements Deflections Prestress Field monitoring |
DOI | 10.1061/(ASCE)CF.1943-5509.0001289 |
英文摘要 | To ensure the safety of constructing the north anchorage excavation of Fuma Yangtze River Bridge, an extensive instrumentation program was carried out to monitor the performance of the excavation. This monitoring effort included the ground movements of soil outside the excavation zone, ground movements of the tops of piles, lateral deflections of piles, and prestress in cables. Based on an analysis of the monitoring data, the following findings were obtained: shallow landslides were induced by rainfall at several locations outside the excavation zone, and the movement directions of soil were consistent with the natural terrain. The horizontal displacements of the west and east top beams were generally larger than that of the north side. The vertical movements of the tops of the piles exhibited heave initially and then transitioned into settlement. The deflected profiles of the piles were similar, and the maximum lateral pile deflections were very close. The measured deformations and internal forces of the support system did not exceed the alarm values, which suggested that the excavation was in a stable state. |
WOS关键词 | GROUND MOVEMENTS ; DEEP EXCAVATION ; WALL |
WOS研究方向 | Construction & Building Technology ; Engineering |
语种 | 英语 |
出版者 | ASCE-AMER SOC CIVIL ENGINEERS |
WOS记录号 | WOS:000458903100001 |
源URL | [http://ir.iggcas.ac.cn/handle/132A11/90683] |
专题 | 地质与地球物理研究所_其他部门 |
通讯作者 | Ran, T. |
作者单位 | 1.Chinese Acad Sci, Inst Geol & Geophys, 19 Beitucheng Western Rd, Beijing 100029, Peoples R China 2.Univ Chinese Acad Sci, 19 A Yuquan Rd, Beijing 100049, Peoples R China 3.Beijing Univ Technol, Coll Architecture & Civil Engn, 100 Pingleyuan, Beijing 100024, Peoples R China 4.Zhongnan Engn Co Ltd, Engn, Power China, 16 Guitangxiangzhang Eastern Rd, Changsha 410014, Hunan, Peoples R China 5.CCCC First Highway Engn Co Ltd, 15-19 Floors Shitong Int Bldg, Beijing 100024, Peoples R China |
推荐引用方式 GB/T 7714 | Ran, T.,Dai, F. C.,Mei, S. H.,et al. Performance of North Anchorage Excavation of Fuma Yangtze River Bridge in Wanzhou, China[J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,2019,33(3):11. |
APA | Ran, T.,Dai, F. C.,Mei, S. H.,Wang, W. W.,&Tan, L. H..(2019).Performance of North Anchorage Excavation of Fuma Yangtze River Bridge in Wanzhou, China.JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,33(3),11. |
MLA | Ran, T.,et al."Performance of North Anchorage Excavation of Fuma Yangtze River Bridge in Wanzhou, China".JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES 33.3(2019):11. |