Practical experiences of cost/schedule measure through earned value management and statistical process control

文献类型:期刊论文

作者Wang, Qing; Jiang, Nan; Gou, Lang; Che, Meiru; Zhang, Ronghui
刊名Software process change
出版日期2006
卷号3966页码:348-354
ISSN号0302-9743
通讯作者Wang, qing(wq@itechs.iscas.ac.cn)
英文摘要Cost and schedule measures are the most important support activities for the success of a project; it provides the basis for process improvement and project management. this paper reports practical experiences on using evm (earned value management) and spc(statistical process control) in cost/ schedule measure. the analysis of experience data indicates the distributions of cpi(cost performance index) and spi(schedule performance index) index are generally following the normal distribution. and consequently, it is reasonable and effective to employ spc in evm.
WOS研究方向Computer Science
WOS类目Computer Science, Software Engineering ; Computer Science, Theory & Methods
语种英语
WOS记录号WOS:000238107800038
出版者SPRINGER-VERLAG BERLIN
URI标识http://www.irgrid.ac.cn/handle/1471x/2379954
专题中国科学院大学
通讯作者Wang, Qing
作者单位1.Chinese Acad Sci, Inst Software, Lab Internet Software Technol, Beijing 100080, Peoples R China
2.Grad Univ, Chinese Acad Sci, Beijing 100039, Peoples R China
推荐引用方式
GB/T 7714
Wang, Qing,Jiang, Nan,Gou, Lang,et al. Practical experiences of cost/schedule measure through earned value management and statistical process control[J]. Software process change,2006,3966:348-354.
APA Wang, Qing,Jiang, Nan,Gou, Lang,Che, Meiru,&Zhang, Ronghui.(2006).Practical experiences of cost/schedule measure through earned value management and statistical process control.Software process change,3966,348-354.
MLA Wang, Qing,et al."Practical experiences of cost/schedule measure through earned value management and statistical process control".Software process change 3966(2006):348-354.

入库方式: iSwitch采集

来源:中国科学院大学

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。