中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel

文献类型:期刊论文

作者Li, Shuangyang; Lai, Yuanming; Zhang, Mingyi; Zhang, Shujuan
刊名COLD REGIONS SCIENCE AND TECHNOLOGY
出版日期2006-12-01
卷号46期号:3页码:181-191
关键词artificial ground freezing subway tunnel pre-freezing time surface settlement
ISSN号0165-232X
DOI10.1016/j.coldregions.2006.09.001
通讯作者Lai, Yuanming(ymlai@ns.lzb.ac.cn)
英文摘要Artificial Ground Freezing (AGF) has been in use for more than a century. However, there are few published papers concerning about thermal and mechanical calculation and analysis of AGE Especially, in the practical project, when other factors such as freeze temperature, quantity and spacing of freeze pipes, are same, the ground pre-freezing time affects the project cost as well as the strength of frozen wall. So, in this paper, a subway double-line tunnel in Guangzhou constructed by AGF is taken as an example. At first, a numerical model for thermal and mechanical analysis is proposed. Then, based on this model, the surface settlements are calculated and compared by using finite element method (FEM) when the ground pre-freezing time are 60, 50, 40 and 30 days, respectively. According to the criteria of code that the maximum surface settlement is less than 30 mm, a minimum pre-freezing time could be selected. At last, under the condition of this minimum pre-freezing time, the temperature fields, stress fields and displacement fields at every excavation step are calculated and analyzed. The safety of frozen earth wall is also evaluated by applying long-term strength equation of frozen soil. (c) 2006 Elsevier B.V. All rights reserved.
收录类别SCI
WOS关键词3-DIMENSIONAL NONLINEAR-ANALYSIS ; PERMAFROST REGIONS ; EMBANKMENT
WOS研究方向Engineering ; Geology
WOS类目Engineering, Environmental ; Engineering, Civil ; Geosciences, Multidisciplinary
语种英语
WOS记录号WOS:000242792600003
出版者ELSEVIER SCIENCE BV
URI标识http://www.irgrid.ac.cn/handle/1471x/2555758
专题寒区旱区环境与工程研究所
通讯作者Lai, Yuanming
作者单位Chinese Acad Sci, State Key Lab Frozen Soil Engn, Cold & Arid Reg Environm & Engn Res Inst, Lanzhou 730000, Gansu, Peoples R China
推荐引用方式
GB/T 7714
Li, Shuangyang,Lai, Yuanming,Zhang, Mingyi,et al. Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel[J]. COLD REGIONS SCIENCE AND TECHNOLOGY,2006,46(3):181-191.
APA Li, Shuangyang,Lai, Yuanming,Zhang, Mingyi,&Zhang, Shujuan.(2006).Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel.COLD REGIONS SCIENCE AND TECHNOLOGY,46(3),181-191.
MLA Li, Shuangyang,et al."Minimum ground pre-freezing time before excavation of Guangzhou subway tunnel".COLD REGIONS SCIENCE AND TECHNOLOGY 46.3(2006):181-191.

入库方式: iSwitch采集

来源:寒区旱区环境与工程研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。