The Qinghai-Tibet Railroad: A milestone project and its environmental impact
文献类型:期刊论文
| 作者 | Zhang, Tingjun1; Baker, T. Harry W.2; Cheng, Guo-Dong3 |
| 刊名 | COLD REGIONS SCIENCE AND TECHNOLOGY
![]() |
| 出版日期 | 2008-08-01 |
| 卷号 | 53期号:3页码:229-240 |
| 关键词 | Permafrost Active layer Roadbed Crushed rock layer Embankment Permafrost engineering |
| ISSN号 | 0165-232X |
| DOI | 10.1016/j.coldregions.2008.06.003 |
| 通讯作者 | Zhang, Tingjun(tzhang@nsidc.org) |
| 英文摘要 | After six years construction, the Qinghai-Tibet Railroad (QTR) was completed in 2006 and it has been successfully operational for two years. QTR crosses about 632 km of permafrost regions. A large fraction of the permafrost region is warm, ice-rich permafrost, which makes it much more difficult to construct any infrastructure system on it. Permafrost scientists and engineers have utilized the state-of the-art technology to actively cool the permafrost under the railroad embankment and to ensure stability of railroad embankment. For the first time, a crushed rock layer was used to cool the permafrost under the embankment in such a huge project. This paper provides an overview of these measures used to cool the permafrost and discusses potential long-term problems. Although the Qinghai-Tibet Railroad is referred as a "green" project, potential long-term environmental impacts should not be underestimated. (C) 2008 Elsevier B.V All rights reserved. |
| 收录类别 | SCI |
| WOS关键词 | PERMAFROST REGIONS ; PLATEAU ; RAILWAY ; CHINA ; CONSTRUCTION ; HIGHWAY |
| WOS研究方向 | Engineering ; Geology |
| WOS类目 | Engineering, Environmental ; Engineering, Civil ; Geosciences, Multidisciplinary |
| 语种 | 英语 |
| WOS记录号 | WOS:000260040200001 |
| 出版者 | ELSEVIER SCIENCE BV |
| URI标识 | http://www.irgrid.ac.cn/handle/1471x/2556082 |
| 专题 | 寒区旱区环境与工程研究所 |
| 通讯作者 | Zhang, Tingjun |
| 作者单位 | 1.Univ Colorado, Cooperat Inst Res Environm Sci, Natl Snow & Ice Data Ctr, Boulder, CO 80309 USA 2.Natl Res Council Canada, Inst Res Construct, Ottawa, ON K1A 0R6, Canada 3.Chinese Acad Sci, State Key Lab Frozen Soil Engn, Cold & Arid Reg Environm & Engn Res Inst, Lanzhou 730000, Peoples R China |
| 推荐引用方式 GB/T 7714 | Zhang, Tingjun,Baker, T. Harry W.,Cheng, Guo-Dong. The Qinghai-Tibet Railroad: A milestone project and its environmental impact[J]. COLD REGIONS SCIENCE AND TECHNOLOGY,2008,53(3):229-240. |
| APA | Zhang, Tingjun,Baker, T. Harry W.,&Cheng, Guo-Dong.(2008).The Qinghai-Tibet Railroad: A milestone project and its environmental impact.COLD REGIONS SCIENCE AND TECHNOLOGY,53(3),229-240. |
| MLA | Zhang, Tingjun,et al."The Qinghai-Tibet Railroad: A milestone project and its environmental impact".COLD REGIONS SCIENCE AND TECHNOLOGY 53.3(2008):229-240. |
入库方式: iSwitch采集
来源:寒区旱区环境与工程研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。