中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Beam dynamics and commissioning of CW RFQ for a compact deuteron-beryllium neutron source

文献类型:期刊论文

作者Dou, Wei-Ping1,2; Chen, Wei-Long1,2; Wang, Feng-Feng1; Wang, Zhi-Jun1; Li, Chen-Xing1; Wu, Qi1; Wang, Chao1; Wang, Wang-sheng1; Jia, Huan1; Zhang, Peng1
刊名NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT
出版日期2018-09-21
卷号903页码:85-90
关键词CW RFQ Internal buncher Beam commissioning
ISSN号0168-9002
DOI10.1016/j.nima.2018.06.044
通讯作者Wang, Zhi-Jun(wangzj@impcas.ac.cn)
英文摘要The Institute of Modern Physics (IMP) of the Chinese Academy of Sciences (CAS) is building a compact neutron source using a superconducting linac. The injector RFQ will operate in continuous wave (CW) mode, accelerating a 10-mA deuteron beam from 20 keV/u to 1.5 MeV/u. To minimize the possibility of beam loss in the downstream superconducting linac and maintain high acceleration efficiency, we take the 99.9% longitudinal beam emittance as the key optimization parameter for the beam dynamics design of the RFQ, and include an internal buncher to reduce the longitudinal beam emittance. This paper describes the design procedures, beam dynamics simulations and preliminary beam commissioning results for this RFQ. Simulation results show that 99.9% longitudinal beam emittance at the RFQ exit is optimized to 3.5 pi mm mrad, which is 0.13 times the longitudinal acceptance of the downstream superconducting linac. Beam commissioning results demonstrate that the RFQ can accelerate 7.8 mA H-2(+) to 3.11 MeV. The transmission efficiency from a Faraday cup before the RFQ to the beam dump after the RFQ is 97.6%. The measured transmission efficiency agrees well with simulation results at different values for the inter-vane voltage.
收录类别SCI
WOS关键词CONCEPTUAL DESIGN
WOS研究方向Instruments & Instrumentation ; Nuclear Science & Technology ; Physics
WOS类目Instruments & Instrumentation ; Nuclear Science & Technology ; Physics, Nuclear ; Physics, Particles & Fields
语种英语
WOS记录号WOS:000444422200011
出版者ELSEVIER SCIENCE BV
URI标识http://www.irgrid.ac.cn/handle/1471x/2558310
专题寒区旱区环境与工程研究所
通讯作者Wang, Zhi-Jun
作者单位1.Chinese Acad Sci, Inst Modern Phys, Lanzhou 73000, Gansu, Peoples R China
2.Univ Chinese Acad Sci, Beijing 100049, Peoples R China
推荐引用方式
GB/T 7714
Dou, Wei-Ping,Chen, Wei-Long,Wang, Feng-Feng,et al. Beam dynamics and commissioning of CW RFQ for a compact deuteron-beryllium neutron source[J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,2018,903:85-90.
APA Dou, Wei-Ping.,Chen, Wei-Long.,Wang, Feng-Feng.,Wang, Zhi-Jun.,Li, Chen-Xing.,...&He, Yuan.(2018).Beam dynamics and commissioning of CW RFQ for a compact deuteron-beryllium neutron source.NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,903,85-90.
MLA Dou, Wei-Ping,et al."Beam dynamics and commissioning of CW RFQ for a compact deuteron-beryllium neutron source".NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT 903(2018):85-90.

入库方式: iSwitch采集

来源:寒区旱区环境与工程研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。