Debris flow amplification in a moraine terrace and related engineering measures in the Zongzhai Valley, Southeastern Tibetan Plateau
文献类型:期刊论文
作者 | Deng, Mingfeng1,2![]() ![]() ![]() ![]() ![]() ![]() |
刊名 | GEOMATICS NATURAL HAZARDS & RISK
![]() |
出版日期 | 2018 |
卷号 | 9期号:1页码:1230-1248 |
关键词 | Moraine terrace debris flows amplification engineering measures southeastern Tibetan Plateau |
ISSN号 | 1947-5705 |
DOI | 10.1080/19475705.2018.1508507 |
通讯作者 | Wang, Tao(wtwang@imde.ac.cn) |
英文摘要 | Debris flows can quickly destroy basic facilities in mountainous areas, where suitable land resources are limited and towns are located on gentle slopes. To alleviate the threat of debris flows, two main approaches, based on debris storage or debris-flow excretion, have been proposed in recent decades in China. In August 2015, a debris flow occurred in the Zongzhai Valley for the first time in the last 100 years. Field surveys, section measurements and discharge calculations indicated that the bulking of the debris flow and the sediment entrainment were serious, resulting in the widening and deepening of the channel along the moraine terrace. Therefore, the two traditional mitigation methods appear to be inappropriate for the debris flows in Zongzhai Valley because this region lacks sufficient space for debris storage and economic support for a long drainage canal. This study analyzed the supply mechanism of the bed material and bank sediments along the moraine terrace and found that the bank collapse was mainly controlled by bed scour. Based on a literature review, we determined that the channel bed strength in the terrace should be increased and proposed that shallow dams be constructed to maintain the stability of the channel bed. The parameters of these shallow dams are provided in this article. |
WOS关键词 | WENCHUAN EARTHQUAKE ; ENTRAINMENT ; SCOUR ; MITIGATION ; EROSION ; IMPACT ; DEPOSITION ; INITIATION ; MECHANISM ; TORRENT |
资助项目 | National Natural Science Foundation of China[41661134012] ; National Natural Science Foundation of China[41402283] ; National Natural Science Foundation of China[41671112] ; 135 Strategic Program of the IMHE, CAS[SDS-135-1705] |
WOS研究方向 | Geology ; Meteorology & Atmospheric Sciences ; Water Resources |
语种 | 英语 |
WOS记录号 | WOS:000485169300001 |
出版者 | TAYLOR & FRANCIS LTD |
资助机构 | National Natural Science Foundation of China ; 135 Strategic Program of the IMHE, CAS |
源URL | [http://ir.imde.ac.cn/handle/131551/27161] ![]() |
专题 | 成都山地灾害与环境研究所_山地灾害与地表过程重点实验室 |
通讯作者 | Wang, Tao |
作者单位 | 1.Chinese Acad Sci, Key Lab Mt Hazards & Earth Surface Proc, Inst Mt Hazards & Environm, Chengdu, Sichuan, Peoples R China 2.Univ Chinese Acad Sci, Beijing, Peoples R China |
推荐引用方式 GB/T 7714 | Deng, Mingfeng,Liu, Mei,Zhang, Yong,et al. Debris flow amplification in a moraine terrace and related engineering measures in the Zongzhai Valley, Southeastern Tibetan Plateau[J]. GEOMATICS NATURAL HAZARDS & RISK,2018,9(1):1230-1248. |
APA | Deng, Mingfeng,Liu, Mei,Zhang, Yong,Chen, Ningsheng,Huang, Na,&Wang, Tao.(2018).Debris flow amplification in a moraine terrace and related engineering measures in the Zongzhai Valley, Southeastern Tibetan Plateau.GEOMATICS NATURAL HAZARDS & RISK,9(1),1230-1248. |
MLA | Deng, Mingfeng,et al."Debris flow amplification in a moraine terrace and related engineering measures in the Zongzhai Valley, Southeastern Tibetan Plateau".GEOMATICS NATURAL HAZARDS & RISK 9.1(2018):1230-1248. |
入库方式: OAI收割
来源:成都山地灾害与环境研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。