DESIGN, CONSTRUCTION AND COMMISSIONING OF THE 100KW RF AMPLIFIER FOR CYCIAE-100

文献类型:会议论文

作者ZhiguoYin ; Zhenlu Zhao ; Shidong Wei ; Yong Xie ; Zhenguo Li ; Bin Ji ; Haichao Xiao ; Tianjue Zhang
出版日期2010-09-10
会议日期2010-09-06
会议地点Lanzhou
关键词Brif Project High Intensity Cyclotron
英文摘要As a major part of the BRIF project, CYCIAE-100, the
100MeV high intensity cyclotron being constructed at
CIAE, will provide 200μA-500μA proton beam ranging
from 75MeV to 100MeV for RIB production. Two
identical 100kW RF amplifiers will be used to drive two
cavities independently to accelerate H- beam up to 100
MeV. The detail technical specification has been
investigated, fixed, and initial design has been finished by
CIAE. Then, the construction design and manufacture is
done by China Academy of Aero and Space. The on site
test is successful by mutual efforts. The final
commissioning is under way with a full scale prototype
cavity at CIAE. A general description of the CYCIAE-100
RF system design will be given, as well as the review of
100kW amplifier design. In the commissioning of the
amplifier with dummy load, different high order
resonances are found when operated at different
frequencies between 42MHz to 46MHz. An equivalent
circuit model is carried out to hunt down the problems.
The model and related analysis will be reported together
with the process and results of high power test with the
cavity load through about 35-meter 6-1/8” rigid coaxial
line.
资助机构IMP;Chinese Academy of Sciences
会议录The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'10
语种英语
URL标识查看原文
源URL[http://ir.imp.cas.cn/handle/113462/8515]  
专题近代物理研究所_近代物理研究所知识存储(2010之前)
推荐引用方式
GB/T 7714
ZhiguoYin,Zhenlu Zhao,Shidong Wei,et al. DESIGN, CONSTRUCTION AND COMMISSIONING OF THE 100KW RF AMPLIFIER FOR CYCIAE-100[C]. 见:. Lanzhou. 2010-09-06.

入库方式: OAI收割

来源:近代物理研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。