中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
AMPLIFIER TEST STAND FOR THE CRM CYCLOTRON

文献类型:会议论文

作者Zhiguo Yin ; Kai Fei ; Guofang Song ; Tianjue Zhang ; Bin Ji ; Pengzhan Li ; Gengshou Liu
出版日期2010-09-10
会议日期2010-09-06
会议地点兰州
英文摘要The final stage amplifier stability has proved to be an important issue in the commissioning of CRM cyclotron at CIAE. An air cooled 4CX15,000 tube final amplifier was designed to evaluate the anode circuit and neutralization, both of which are weak points of the CRM cyclotron amplifier. Instead of strip line, the new designed anode structure adopts coaxial form, resulting less chance of parasitic resonance in the circuits. A tuneable neutralization circuits was also included in the design, giving an opportunity to fine tune in high power operations. First, the instability in CRM RF system will be analyzed in this paper, followed with the new amplifier designs including the tube operating line calculations, input/output circuits designs and finite integral simulations. The mechanical design for tube socket and anode tank were successfully carried out using the data provided in this paper. The final stage amplifier was then manufactured, assembled and commissioned. In the power test with dummy load, more than 9.2kW RF fundamental power was provided at the frequency of 44.5MHz.
资助机构IMP;Chinese Academy of Sciences
会议录The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'17
语种英语
URL标识查看原文
源URL[http://ir.imp.cas.cn/handle/113462/8533]  
专题近代物理研究所_近代物理研究所知识存储(2010之前)
推荐引用方式
GB/T 7714
Zhiguo Yin,Kai Fei,Guofang Song,et al. AMPLIFIER TEST STAND FOR THE CRM CYCLOTRON[C]. 见:. 兰州. 2010-09-06.

入库方式: OAI收割

来源:近代物理研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。