中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
POST-ACCELERATION OF HIGH INTENSITY RIB THROUGH THE CIME CYCLOTRON IN THE FRAME OF THE SPIRAL2 PROJECT AT GANIL

文献类型:会议论文

作者A. Savalle ; P. Bertrand ; GANIL ; Caen
出版日期2010-09-10
会议日期2010-09-06
会议地点兰州
英文摘要The cyclotron CIME is presently used at GANIL for the acceleration of SPIRAL1 radioactive beams. One of the goals of the SPIRAL2 project is to produce, postaccelerate and use in the existing experimental areas much higher intensity secondary beams induced by uranium fission like neutron-rich krypton, xenon, tin isotopes, and many others. Intensity may reach 1010 pps. Specific developments are needed for secondary beam diagnostics. Improvement of mass separation is also necessary, and the Vertical Mass Separator (VMS) is specially developed for this purpose. However, the main concern is related to the high radioactivity linked to RIB high intensity. Safety and radioprotection issues will require modifications of the installation with special care for the maintenance of the cyclotron. The experience of the SPIRAL1 beams, in terms of beam losses and equipment contamination, is especially useful to define the necessary modifications
资助机构IMP;Chinese Academy of Sciences
会议录The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'46
语种英语
URL标识查看原文
源URL[http://ir.imp.cas.cn/handle/113462/8591]  
专题近代物理研究所_近代物理研究所知识存储(2010之前)
推荐引用方式
GB/T 7714
A. Savalle,P. Bertrand,GANIL,et al. POST-ACCELERATION OF HIGH INTENSITY RIB THROUGH THE CIME CYCLOTRON IN THE FRAME OF THE SPIRAL2 PROJECT AT GANIL[C]. 见:. 兰州. 2010-09-06.

入库方式: OAI收割

来源:近代物理研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。