POST-ACCELERATION OF HIGH INTENSITY RIB THROUGH THE CIME CYCLOTRON IN THE FRAME OF THE SPIRAL2 PROJECT AT GANIL
文献类型:会议论文
作者 | A. Savalle ; P. Bertrand ; GANIL ; Caen |
出版日期 | 2010-09-10 |
会议日期 | 2010-09-06 |
会议地点 | 兰州 |
英文摘要 | The cyclotron CIME is presently used at GANIL for the acceleration of SPIRAL1 radioactive beams. One of the goals of the SPIRAL2 project is to produce, postaccelerate and use in the existing experimental areas much higher intensity secondary beams induced by uranium fission like neutron-rich krypton, xenon, tin isotopes, and many others. Intensity may reach 1010 pps. Specific developments are needed for secondary beam diagnostics. Improvement of mass separation is also necessary, and the Vertical Mass Separator (VMS) is specially developed for this purpose. However, the main concern is related to the high radioactivity linked to RIB high intensity. Safety and radioprotection issues will require modifications of the installation with special care for the maintenance of the cyclotron. The experience of the SPIRAL1 beams, in terms of beam losses and equipment contamination, is especially useful to define the necessary modifications |
资助机构 | IMP;Chinese Academy of Sciences |
会议录 | The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'46
![]() |
语种 | 英语 |
URL标识 | 查看原文 |
源URL | [http://ir.imp.cas.cn/handle/113462/8591] ![]() |
专题 | 近代物理研究所_近代物理研究所知识存储(2010之前) |
推荐引用方式 GB/T 7714 | A. Savalle,P. Bertrand,GANIL,et al. POST-ACCELERATION OF HIGH INTENSITY RIB THROUGH THE CIME CYCLOTRON IN THE FRAME OF THE SPIRAL2 PROJECT AT GANIL[C]. 见:. 兰州. 2010-09-06. |