PROGRESS ON CONSTRUCTION OF CYCIAE-100
文献类型:会议论文
作者 | Technology Division of BRIF ; Tianjue Zhang ; Zhenguo Li ; Yinlong Lu |
出版日期 | 2010-09-10 |
会议日期 | 2010-09-06 |
会议地点 | 兰州 |
英文摘要 | Beijing Radioactive Ion-beam Facility (BRIF) is being built at China Institute of Atomic Energy (CIAE). As a driving accelerator for ion beam production, CYCIAE- 100 will provide proton beam of 75MeV~100MeV with an intensity of 200μA~500μA. At present, the design for each system has been accomplished and an overall progress has been made for the CYCIAE-100 project. The manufacture of the main magnet has entered into the final assembly stage. Two main magnet coils have been completed, two 100kW RF amplifiers are tested with full output power, the main vacuum chamber and main magnet lift system will be completed soon. The construction designs and suppliers surveys for other systems are finished and ready for purchase. Some key design and technology experiments are in process and significant results have been achieved in verifications. The “Central Region Model Test Stand for High Intensity Cyclotron Development” (CYCIAE-CRM) has successfully passed the formal certification held by the competent authorities. A full scale experimental RF cavity has been fabricated, on which the frequency and Q value measured coincide well with the numerically calculation. The verification test of vacuum cryo-panel structure has provided valuable information to cryo-panel structure design. The key technical problems related to CYCIAE-100 project are being solved along with the progress. |
资助机构 | IMP;Chinese Academy of Sciences |
会议录 | The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'52
![]() |
语种 | 英语 |
URL标识 | 查看原文 |
源URL | [http://ir.imp.cas.cn/handle/113462/8603] ![]() |
专题 | 近代物理研究所_近代物理研究所知识存储(2010之前) |
推荐引用方式 GB/T 7714 | Technology Division of BRIF,Tianjue Zhang,Zhenguo Li,et al. PROGRESS ON CONSTRUCTION OF CYCIAE-100[C]. 见:. 兰州. 2010-09-06. |
入库方式: OAI收割
来源:近代物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。