TOWARDS THE 2 MW CYCLOTRON AND LATEST DEVELOPMENTS AT PSI
文献类型:会议论文
作者 | M. Seidel ; Ch. Baumgarten ; M. Bopp ; J. Grillenberger ; Y. Lee ; D. Kiselev ; A. Mezger ; H. Müller ; M. Schneider ; A. Strinning |
出版日期 | 2010-09-10 |
会议日期 | 2010-09-06 |
会议地点 | 兰州 |
英文摘要 | PSI operates a cyclotron based high intensity proton accelerator routinely at an average beam power of 1.3MW. With this power the facility is at the worldwide forefront of high intensity proton accelerators. An upgrade program is under way to ensure high operational reliability and push the intensity to even higher levels. The beam current is practically limited by losses at extraction and the resulting activation of accelerator components. Further intensity upgrades are only possible if the relative losses can be lowered in proportion, thus keeping absolute losses at a constant level. The basic upgrade path involves the reduction of space charge induced extraction losses by implementing improved RF systems and resonators in both cyclotrons. The paper describes the ongoing upgrade program, achievements that were realized since the last cyclotron conference and several operational experiences and difficulties that were observed during routine operation. |
资助机构 | IMP;Chinese Academy of Sciences |
会议录 | The 19th International Conference on Cyclotrons and their Applications, CYCLOTRONS'55
![]() |
语种 | 英语 |
URL标识 | 查看原文 |
源URL | [http://ir.imp.cas.cn/handle/113462/8609] ![]() |
专题 | 近代物理研究所_近代物理研究所知识存储(2010之前) |
推荐引用方式 GB/T 7714 | M. Seidel,Ch. Baumgarten,M. Bopp,et al. TOWARDS THE 2 MW CYCLOTRON AND LATEST DEVELOPMENTS AT PSI[C]. 见:. 兰州. 2010-09-06. |
入库方式: OAI收割
来源:近代物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。