Low-level radio-frequency system upgrade for the IMP Heavy Ion Reach Facility in Lanzhou (HIRFL)
文献类型:期刊论文
作者 | Cong, Yan1,3; Xu, Shaofan2; Zhou, Wenxiong4; Wang, Haoning1; Ren, Hongwen1; Zhang, Ruifeng1; Yi, Xiaoping1; Li, Shilong1; Feng, Yong1; Han, Xiaodong1 |
刊名 | NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT |
出版日期 | 2019-05-01 |
卷号 | 925页码:76-86 |
ISSN号 | 0168-9002 |
关键词 | LLRF PI filter Temperature drift compensation Digital down conversion Phase modulation suppression |
DOI | 10.1016/j.nima.2019.01.086 |
英文摘要 | The upgrade of the Heavy Ion Research Facility in Lanzhou (HIRFL) began in 2000 to enhance the performance in nuclear physics, atomic physics, irradiative materials, and biology, cancer therapy using heavy ions and hadron physics. The upgraded program of HIRFL aimed to provide all ions from protons to uranium for higher beam intensity. As one of subprojects upgrade program in HIRFL, the low-level radio frequency (LLRF) system is also completely redesigned to better stabilize the beam acceleration parameters during the machine operation. The purpose of this article is to describe the design and implementation of the new fully digital LLRF system for six sets of radio frequency (RF) systems at the HIRFL. All components, including the quadrature demodulation, phase and amplitude detectors, phase shifter, and proportional integral (PI) loop filter, were designed in detail and realized in field programmable gate array (FPGA). A special synchronous RF source was designed to provide a phase reference for the different RF systems. A new tuning system was designed to ensure that the RF system remains in a good working state. An economical compensation method for the temperature drift in the pick-up cables was designed to improve the control accuracy of the system. The new LLRF systems have passed a 24 h high power test on the HIRFL cavities. The phase stabilization control accuracy was vertical bar Delta phi vertical bar <= 0.2 degrees, and the amplitude fluctuation was vertical bar Delta A vertical bar <= 2 * 10(-3). Compared with the original analog system, the control precision and stability have been improved by an order of magnitude. The extraction beam energy of SFC was measured, and its stability is better than 4.3 * 10(-3), after this LLRF system is applied successfully. |
资助项目 | National Natural Science Foundation of China[11505252] ; Youth Innovation Promotion Association, China |
WOS研究方向 | Instruments & Instrumentation ; Nuclear Science & Technology ; Physics |
语种 | 英语 |
出版者 | ELSEVIER SCIENCE BV |
WOS记录号 | WOS:000460539400009 |
资助机构 | National Natural Science Foundation of China ; Youth Innovation Promotion Association, China |
源URL | [http://119.78.100.186/handle/113462/134302] |
专题 | 中国科学院近代物理研究所 |
通讯作者 | Cong, Yan |
作者单位 | 1.Chinese Acad Sci, Inst Modern Phys, Lanzhou 730000, Gansu, Peoples R China 2.Lanzhou Univ, Lanzhou 730000, Gansu, Peoples R China 3.Huizhou Ion Sci Res Ctr, Huizhou 516000, Peoples R China 4.Chongqing Univ, Chongqing 400044, Peoples R China |
推荐引用方式 GB/T 7714 | Cong, Yan,Xu, Shaofan,Zhou, Wenxiong,et al. Low-level radio-frequency system upgrade for the IMP Heavy Ion Reach Facility in Lanzhou (HIRFL)[J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,2019,925:76-86. |
APA | Cong, Yan.,Xu, Shaofan.,Zhou, Wenxiong.,Wang, Haoning.,Ren, Hongwen.,...&Mao, Junjie.(2019).Low-level radio-frequency system upgrade for the IMP Heavy Ion Reach Facility in Lanzhou (HIRFL).NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,925,76-86. |
MLA | Cong, Yan,et al."Low-level radio-frequency system upgrade for the IMP Heavy Ion Reach Facility in Lanzhou (HIRFL)".NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT 925(2019):76-86. |
入库方式: OAI收割
来源:近代物理研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。