中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Enhancement of sediment phosphorus release during a tunnel construction across an urban lake (Lake Donghu, China)

文献类型:期刊论文

作者Wang, Siyang2,3; Li, Hui1; Xiao, Jian2,3; Zhou, Yiyong3; Song, Chunlei3; Bi, Yonghong3; Cao, Xiuyun3
刊名ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH
出版日期2016-09-01
卷号23期号:17页码:17774-17783
关键词Tunnel construction Alkaline phosphatase Dehydrogenase Extracellular enzymes Iron-bound phosphorus Lake eutrophication
ISSN号0944-1344
DOI10.1007/s11356-016-6949-x
英文摘要

Tunnel construction in watershed area of urban lakes would accelerate eutrophication by inputting nutrients into them, while mechanisms underlying the internal phosphorus cycling as affected by construction events are scarcely studied. Focusing on two main pathways of phosphorus releasing from sediment (enzymatic mineralization and anaerobic desorption), spatial and temporal variations in phosphorus fractionation, and activities of extracellular enzymes (alkaline phosphatase, beta-1,4-glucosidase, leucine aminopeptidase, dehydrogenase, lipase) in sediment were examined, together with relevant parameters in interstitial and surface waters in a Chinese urban lake (Lake Donghu) where a subaqueous tunnel was constructed across it from October 2013 to July 2014. Higher alkaline phosphatase activity (APA) indicated phosphorus deficiency for phytoplankton, as illustrated by a significantly negative relationship between APA and concentration of dissolved total phosphorus (DTP). Noticeably, in the construction area, APAs in both sediment and surface water were significantly lower than those in other relevant basins, suggesting a phosphorus supply from some sources in this area. In parallel, its sediment gave the significantly lower iron-bound phosphorus (Fe(OOH)similar to P) content, coupled with significantly higher ratio of iron (II) to total iron content (Fe2+/TFe) and dehydrogenase activities (DHA). Contrastingly, difference in the activities of sediment hydrolases was not significant between the construction area and other basins studied. Thus, in the construction area, subsidy of bioavailable phosphorus from sediment to surface water was attributable to the anaerobic desorption of Fe(OOH)similar to P rather than enzymatic mineralization. Finally, there exisosphate, and thereby facilitating phytoplankton growth in water column.ted a significantly positive relationship between chlorophyll a concentration in surface water and Fe(OOH)similar to P content in sediment. In short, construction activities within lakes may interrupt cycling patterns of phosphorus across sediment-water interface by enhancing release of redox-sensitive ph

WOS关键词ALKALINE-PHOSPHATASE ACTIVITY ; WATER-QUALITY ; DEHYDROGENASE-ACTIVITY ; SHALLOW LAKE ; RESERVOIR ; DYNAMICS ; RIVER ; SOIL ; EUTROPHICATION ; MANAGEMENT
资助项目National Natural Science Funds of China[41230748] ; National Natural Science Funds of China[41173081] ; National Natural Science Funds of China[41073066] ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology[2014FBZ01]
WOS研究方向Environmental Sciences & Ecology
语种英语
WOS记录号WOS:000382674800081
出版者SPRINGER HEIDELBERG
资助机构National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; National Natural Science Funds of China ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; tunnel construction project key techniques of water pollution disposal and comprehensive environmental control under the severe anthropogenic disturbance ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology ; State Key Laboratory of Freshwater Ecology and Biotechnology
源URL[http://ir.ihb.ac.cn/handle/342005/34627]  
专题水生生物研究所_藻类生物学及应用研究中心_期刊论文
通讯作者Cao, Xiuyun
作者单位1.Tongren Univ, Coll Biol & A&F Engn, Tongren 554300, Guizhou, Peoples R China
2.Univ Chinese Acad Sci, Beijing 100039, Peoples R China
3.Chinese Acad Sci, Inst Hydrobiol, State Key Lab Freshwater Ecol & Biotechnol, 7 Donghu South Rd, Wuhan 430072, Peoples R China
推荐引用方式
GB/T 7714
Wang, Siyang,Li, Hui,Xiao, Jian,et al. Enhancement of sediment phosphorus release during a tunnel construction across an urban lake (Lake Donghu, China)[J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH,2016,23(17):17774-17783.
APA Wang, Siyang.,Li, Hui.,Xiao, Jian.,Zhou, Yiyong.,Song, Chunlei.,...&Cao, Xiuyun.(2016).Enhancement of sediment phosphorus release during a tunnel construction across an urban lake (Lake Donghu, China).ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH,23(17),17774-17783.
MLA Wang, Siyang,et al."Enhancement of sediment phosphorus release during a tunnel construction across an urban lake (Lake Donghu, China)".ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH 23.17(2016):17774-17783.

入库方式: OAI收割

来源:水生生物研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。