中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Optimization of Clean Room Infrastructure and Procedure During LCLS-II Cryomodule Production at Fermilab

文献类型:会议论文

作者G. Wu; S.D. Adams; T.T. Arkan; M.A. Battistoni;  D.J. Bice; M.B. Chlebek; E.R. Harms; B.M. Kuhn; A.M. Rowe
会议日期2019
会议地点Germany
会议录Proceedings of the 19th International Conference on RF Superconductivity
语种英语
源URL[http://ir.ihep.ac.cn/handle/311005/287490]  
专题学术会议_国际参会_JaCoW高能所参会会议_SRF
作者单位Fermilab, Batavia, Illinois, USA
推荐引用方式
GB/T 7714
G. Wu,S.D. Adams,T.T. Arkan,et al. Optimization of Clean Room Infrastructure and Procedure During LCLS-II Cryomodule Production at Fermilab[C]. 见:. Germany. 2019.

入库方式: OAI收割

来源:高能物理研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。