THE CASE STUDY OF BINARY POWER PLANT BASED ON THERMOECONOMICS IN SICHUAN, CHINA
文献类型:期刊论文
作者 | Luo, Chao1,2,3,4![]() ![]() ![]() |
刊名 | THERMAL SCIENCE
![]() |
出版日期 | 2018 |
卷号 | 22期号:2页码:1003-1014 |
关键词 | geothermal power plant binary cycle thermoeconomics capital cost engineering equation solver |
ISSN号 | 0354-9836 |
DOI | 10.2298/TSC1160319022L |
通讯作者 | Zhao, Jun(zhaojun_tju@hotmail.com) |
英文摘要 | In China, renewable energy power plant will be built from the year 2016 to 2020, because of CO, emission assignment and energy company demand. A geothermal power plant will be designed in Sichuan province. The wet temperature 15 degrees C is selected for cooling temperature. Thermoeconomics of geothermal power system are analyzed using the engineering equation solver. The results show that the capacity of binary power system is 3506 kW and optimum vaporizing pressure is 28 bar, the thermal and exergy efficiency is 13% and 45%. The turbine shaft work of flash power system is 2301 kW and the parasitic load is 71 kW, the optimum flash pressures is 0.95 bar, the thermal and exergy efficiency is 7.9% and 34.7%. the total capital investment of binary system is about 9,767,000 US$, the average annual profit is 1,308,000 $/year; the average rate of return is 13.39%; the payback period is less than 6 years. Condenser destruction and loss exergy is more than other components in the power system. The geothermal power production cost is 0.04 US$/kWh in Sichuan province. |
WOS关键词 | ORGANIC RANKINE CYCLES ; TEMPERATURE GEOTHERMAL SOURCES ; EXERGETIC ANALYSIS ; OPTIMIZATION ; PERFORMANCE ; EXPLOITATION ; SYSTEM ; HEAT ; PART |
资助项目 | National Natural Science Funds[51406212] ; Key Laboratory of Efficient Utilization of Low and Medium Grade Energy (Tianjin University), Ministry of Education of China[201604-503] |
WOS研究方向 | Thermodynamics |
语种 | 英语 |
WOS记录号 | WOS:000431923000022 |
出版者 | VINCA INST NUCLEAR SCI |
资助机构 | National Natural Science Funds ; Key Laboratory of Efficient Utilization of Low and Medium Grade Energy (Tianjin University), Ministry of Education of China |
源URL | [http://ir.giec.ac.cn/handle/344007/23183] ![]() |
专题 | 中国科学院广州能源研究所 |
通讯作者 | Zhao, Jun |
作者单位 | 1.Chinese Acad Sci, Guangzhou Inst Energy Convers, Guangzhou, Guangdong, Peoples R China 2.Tianjin Univ, Minist Educ, Key Lab Efficient Utilizat Low & Medium Grade Ene, Tianjin, Peoples R China 3.CAS Key Lab Renewable Energy, Guangzhou, Guangdong, Peoples R China 4.Guangdong Prov Key Lab New & Renewable Energy Res, Guangzhou, Guangdong, Peoples R China |
推荐引用方式 GB/T 7714 | Luo, Chao,Wang, Yongzhen,Gong, Yulie,et al. THE CASE STUDY OF BINARY POWER PLANT BASED ON THERMOECONOMICS IN SICHUAN, CHINA[J]. THERMAL SCIENCE,2018,22(2):1003-1014. |
APA | Luo, Chao,Wang, Yongzhen,Gong, Yulie,Ma, Weibin,Zhao, Jun,&An, Qingsong.(2018).THE CASE STUDY OF BINARY POWER PLANT BASED ON THERMOECONOMICS IN SICHUAN, CHINA.THERMAL SCIENCE,22(2),1003-1014. |
MLA | Luo, Chao,et al."THE CASE STUDY OF BINARY POWER PLANT BASED ON THERMOECONOMICS IN SICHUAN, CHINA".THERMAL SCIENCE 22.2(2018):1003-1014. |
入库方式: OAI收割
来源:广州能源研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。