Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant

文献类型:期刊论文

作者Wu, Chuangzhi1,2; Yin, Xiuli1; Ma, Longlong1; Zhou, Zhaoqiu1; Chen, Hanping2
刊名energy & fuels
出版日期2008-11-01
卷号22期号:6页码:4259-4264
关键词POWER-GENERATION SYSTEM ENERGY FARM PROJECT COMBUSTION CHARACTERISTICS FIXED-BED CHINA TECHNOLOGIES
ISSN号0887-0624
通讯作者xlyin@ms.giec.ac.cn
中文摘要the design and operation of a 5.5 mwe biomass integrated gasification combined cycle (igcc) demonstration plant, which is located in xinghua, jiangsu province of china, are introduced. it is the largest complete biomass gasification power plant that uses rice husk and other agricultural wastes as fuel in asia. it mainly consists of a 20 mwt atmospheric circulating fluidized-bed gasifier, a gas-purifying system, 10 sets of 450 kw(e) gas engines, a waste heat boiler, a 1.5 mwe steam turbine, a wastewater treatment system, etc. the demonstration plant has been operating since the end of 2005, and its overall efficiency reaches 26-28%. its capital cost is less than 1200 usd/kw, and its running cost is about 0.079 usd/kwh based on the biomass price of 35.7 usd/ton. there is a 20% increment on capital cost and 35% decrease on the fuel consumption compared to that of a 1 mw system without a combined cycle. because only part of the project has been performed, many of the tests still remain and, accordingly, must be reported at a later opportunity.
英文摘要the design and operation of a 5.5 mwe biomass integrated gasification combined cycle (igcc) demonstration plant, which is located in xinghua, jiangsu province of china, are introduced. it is the largest complete biomass gasification power plant that uses rice husk and other agricultural wastes as fuel in asia. it mainly consists of a 20 mwt atmospheric circulating fluidized-bed gasifier, a gas-purifying system, 10 sets of 450 kw(e) gas engines, a waste heat boiler, a 1.5 mwe steam turbine, a wastewater treatment system, etc. the demonstration plant has been operating since the end of 2005, and its overall efficiency reaches 26-28%. its capital cost is less than 1200 usd/kw, and its running cost is about 0.079 usd/kwh based on the biomass price of 35.7 usd/ton. there is a 20% increment on capital cost and 35% decrease on the fuel consumption compared to that of a 1 mw system without a combined cycle. because only part of the project has been performed, many of the tests still remain and, accordingly, must be reported at a later opportunity.
WOS标题词science & technology ; technology
类目[WOS]energy & fuels ; engineering, chemical
研究领域[WOS]energy & fuels ; engineering
关键词[WOS]power-generation system ; energy farm project ; combustion characteristics ; fixed-bed ; china ; technologies
收录类别SCI
资助信息national tenth five-year plan of china [2003aa514010]; knowledge innovation program of cas [kgcx2-306]; ministry of science and technology of the people's republic of china ; chinese academy of sciences
原文出处http://pubs.acs.org/journal/enfuem
语种英语
WOS记录号WOS:000261057100096
公开日期2010-09-23
源URL[http://ir.giec.ac.cn/handle/344007/3410]  
专题中国科学院广州能源研究所
作者单位1.Chinese Acad Sci, Guangzhou Inst Energy Convers, Renewable Energy & Gas Hydrate Key Lab, Guangzhou 510640, Peoples R China
2.Huazhong Univ Sci & Technol, State Key Lab Coal Combust, Wuhan 430074, Peoples R China
推荐引用方式
GB/T 7714
Wu, Chuangzhi,Yin, Xiuli,Ma, Longlong,et al. Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant[J]. energy & fuels,2008,22(6):4259-4264.
APA Wu, Chuangzhi,Yin, Xiuli,Ma, Longlong,Zhou, Zhaoqiu,&Chen, Hanping.(2008).Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant.energy & fuels,22(6),4259-4264.
MLA Wu, Chuangzhi,et al."Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant".energy & fuels 22.6(2008):4259-4264.

入库方式: OAI收割

来源:广州能源研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。