中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Injection performance prediction of the upgraded neutral beam on EAST

文献类型:期刊论文

作者Wang, Ji; Chen, Yuqing; Wu, Bin; Yang, Zhen; Hu, Chundong; Xie, Yuanlai; Xie, Yahong; Zhong, Guoqiang; He, Liang; Wang, Fudi
刊名FUSION ENGINEERING AND DESIGN
出版日期2021-05-01
卷号166
关键词Neutral beam Plasma heating Power losses Neutron rate Current drive
ISSN号0920-3796
DOI10.1016/j.fusengdes.2021.112277
通讯作者Chen, Yuqing(chenyq205@ipp.ac.cn)
英文摘要The neutral beams(NB) on EAST are being upgraded according to the scheme that the beamline located on Port F will be moved to Port D and adjusted clockwise injection to counterclockwise injection(top view), while the beamline on Port A is unchanged with counterclockwise injection. The two beamlines are modified to counterclockwise injection consistent with the direction of plasma current (co-IP) instead of the primarily balancedinjection (co-IP and counter-IP). The two coming co-IP beamlines are expected to play important roles in plasma heating, neutron emission and current drive in EAST operating scenarios. The injection performances after the beam upgrade are predicted by the simulation codes ONETWO/NUBEAM and TRANSP/NUBEAM to model the discharges on EAST. After the beamlines are upgraded, the bulk ions are heated to a high temperature above 3.2 keV, which is much higher than that in the previous experiments. The orbit loss drops sharply by 83 % and the external charge exchange loss drops by 50 % after the beamline upgrade. The neutron rate induced by the upgraded beamline is greatly enhanced to the order of 1014/s with co-IP injection as opposed to the balancedinjection, and it is also heightened with the increases of plasma density and beam power. The simulation results show that it leads to a significant improvement of the beam-driven current and provides a practical condition for EAST to carry out long pulse and steady-state experiments. The assessment on the injection capabilities of the upgraded neutral beams is an important guiding reference to the subsequent EAST experiments.
WOS关键词CURRENT DRIVE ; TRANSPORT
资助项目National Natural Science Foundation of China[11705229] ; National Natural Science Foundation of China[11905142] ; National Key R and D Program of China[2017YFE0301105]
WOS研究方向Nuclear Science & Technology
语种英语
WOS记录号WOS:000640897800007
出版者ELSEVIER SCIENCE SA
资助机构National Natural Science Foundation of China ; National Key R and D Program of China
源URL[http://ir.hfcas.ac.cn:8080/handle/334002/122438]  
专题中国科学院合肥物质科学研究院
通讯作者Chen, Yuqing
作者单位Chinese AcAd Sci, Inst Plasma Phys, Hefei, Peoples R China
推荐引用方式
GB/T 7714
Wang, Ji,Chen, Yuqing,Wu, Bin,et al. Injection performance prediction of the upgraded neutral beam on EAST[J]. FUSION ENGINEERING AND DESIGN,2021,166.
APA Wang, Ji.,Chen, Yuqing.,Wu, Bin.,Yang, Zhen.,Hu, Chundong.,...&Wang, Fudi.(2021).Injection performance prediction of the upgraded neutral beam on EAST.FUSION ENGINEERING AND DESIGN,166.
MLA Wang, Ji,et al."Injection performance prediction of the upgraded neutral beam on EAST".FUSION ENGINEERING AND DESIGN 166(2021).

入库方式: OAI收割

来源:合肥物质科学研究院

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。