中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Risk assessment on the CCUS project using risk breakdown structure methodology: A case study on Jilin oilfield CO2-EOR Hei-79 block

文献类型:期刊论文

作者Lv, Hongying1; Wang, Luochun1; Liu, Guizhen2; Lou, Ziyang3; Pang, Lingyun4; Cai, Bofeng4; Li, Qi2
刊名GREENHOUSE GASES-SCIENCE AND TECHNOLOGY
出版日期2021-06-09
期号-页码:14
ISSN号2152-3878
关键词risk assessment risk potential matrix CCUS CO2-EOR hazard and sensitive
DOI10.1002/ghg.2077
英文摘要The risk potential matrix method can be used as a reference for the optimization of the traditional risk matrix in geological CO2 storage. This study used monitoring data for environmentally sensitive receptors in the Jilin Oilfield CO2-enhanced oil recovery (CO2-EOR) Hei-79 block in conjunction with a hazard event store to create an updated risk assessment of CO2 capture, use, and storage (CCUS) as a guide for risk management. The assessment built upon the overall project operation status to evaluate six and five sub-categories of hazard and sensitivity, respectively. The environmental sensitivity threshold integrated ecosystems and secondary geological disasters to amplify potential risks. The results of the risk assessment of the CO2-EOR Hei-79 block in the Jilin Oilfield showed that despite an overall risk level of II, the hazard level resulted in an unacceptable increase in overall risk. Formations are usually stimulated by fracturing in Jilin Oilfield, particularly for oil and gas production. (c) 2021 Society of Chemical Industry and John Wiley & Sons, Ltd.
资助项目PetroChina Jilin Oilfield Company
WOS研究方向Energy & Fuels ; Engineering ; Environmental Sciences & Ecology
语种英语
出版者WILEY PERIODICALS, INC
WOS记录号WOS:000659311400001
源URL[http://119.78.100.198/handle/2S6PX9GI/27513]  
专题中科院武汉岩土力学所
作者单位1.Shanghai Univ Elect Power, Shanghai, Peoples R China
2.Chinese Acad Sci, Inst Rock & Soil Mech, Wuhan, Peoples R China
3.Shanghai Jiao Tong Univ, Shanghai, Peoples R China
4.Chinese Acad Environm Planning, Beijing, Peoples R China
推荐引用方式
GB/T 7714
Lv, Hongying,Wang, Luochun,Liu, Guizhen,et al. Risk assessment on the CCUS project using risk breakdown structure methodology: A case study on Jilin oilfield CO2-EOR Hei-79 block[J]. GREENHOUSE GASES-SCIENCE AND TECHNOLOGY,2021(-):14.
APA Lv, Hongying.,Wang, Luochun.,Liu, Guizhen.,Lou, Ziyang.,Pang, Lingyun.,...&Li, Qi.(2021).Risk assessment on the CCUS project using risk breakdown structure methodology: A case study on Jilin oilfield CO2-EOR Hei-79 block.GREENHOUSE GASES-SCIENCE AND TECHNOLOGY(-),14.
MLA Lv, Hongying,et al."Risk assessment on the CCUS project using risk breakdown structure methodology: A case study on Jilin oilfield CO2-EOR Hei-79 block".GREENHOUSE GASES-SCIENCE AND TECHNOLOGY .-(2021):14.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。