Construction of the Primorsky No. 1 and No. 2 International Transport Corridors: Risk Evaluation and Mitigation Policies
文献类型:期刊论文
作者 | Yang, Yang1; Dong, Suocheng1,2; Boldanov, Tamir1,2; Li, Fujia1,2,3; Cheng, Hao1; Liu, Qian1,2; Li, Yu1,2; Li, Zehong1,2 |
刊名 | SUSTAINABILITY
![]() |
出版日期 | 2021-02-01 |
卷号 | 13期号:4页码:24 |
关键词 | Primorsky No 1 and No 2 international transport corridors risk evaluation spatial distribution mitigation policies entropy method |
DOI | 10.3390/su13042120 |
通讯作者 | Li, Fujia(lifj@igsnrr.ac.cn) |
英文摘要 | The construction of the Primorsky No. 1 and No. 2 international transport corridors is of great strategic significance to China and Russia. These corridors will solve the problem of the absence of an estuary in Northeast China by sailing from Russian ports and concurrently greatly improve Russia's position in the world's transport system. However, existing research studies mainly focus on the strategic significance of these corridors, while research studies on the identification, evaluation, and mitigation policies of their construction risks are rare, which inhibits the construction progress. To promote the construction of these corridors, we firstly identify the main risks in the construction of these corridors, which are economic, transport infrastructure-related, policy-related, eco-environmental, and disaster-related risks. Then, we establish a comprehensive evaluation system, and by applying the entropy method, we quantitatively evaluate the degrees of risks in regions along the transport corridors, reveal their spatial distribution patterns, and identify the key prevention and control regions for these risks. Afterwards, we propose targeted mitigation policies such as establishing innovative cooperation modes and a special foundation to mitigate economic risk and formulate further regional development policies to mitigate policy-related risk. This research will provide scientific support for risk prevention and control for the construction of these corridors. |
资助项目 | Science and Technology Basic Resources Survey Project[2017FY101304] ; Strategic Priority Research Program (A) of Chinese Academy of Sciences[XDA20030203] ; Innovation Academy for Green Manufacture, Chinese Academy of Sciences[IGAM-2019-A16-2] ; National Natural Science Foundation of China[42071282] |
WOS研究方向 | Science & Technology - Other Topics ; Environmental Sciences & Ecology |
语种 | 英语 |
WOS记录号 | WOS:000624838600001 |
出版者 | MDPI |
资助机构 | Science and Technology Basic Resources Survey Project ; Strategic Priority Research Program (A) of Chinese Academy of Sciences ; Innovation Academy for Green Manufacture, Chinese Academy of Sciences ; National Natural Science Foundation of China |
源URL | [http://ir.igsnrr.ac.cn/handle/311030/160401] ![]() |
专题 | 中国科学院地理科学与资源研究所 |
通讯作者 | Li, Fujia |
作者单位 | 1.Chinese Acad Sci, Inst Geog Sci & Nat Resources Res, Dept Resources Econ & Mineral Resources Res, Beijing 100101, Peoples R China 2.Univ Chinese Acad Sci, Coll Resource & Environm, Beijing 100049, Peoples R China 3.Chinese Acad Sci, Innovat Acad Green Manufacture, Beijing 100190, Peoples R China |
推荐引用方式 GB/T 7714 | Yang, Yang,Dong, Suocheng,Boldanov, Tamir,et al. Construction of the Primorsky No. 1 and No. 2 International Transport Corridors: Risk Evaluation and Mitigation Policies[J]. SUSTAINABILITY,2021,13(4):24. |
APA | Yang, Yang.,Dong, Suocheng.,Boldanov, Tamir.,Li, Fujia.,Cheng, Hao.,...&Li, Zehong.(2021).Construction of the Primorsky No. 1 and No. 2 International Transport Corridors: Risk Evaluation and Mitigation Policies.SUSTAINABILITY,13(4),24. |
MLA | Yang, Yang,et al."Construction of the Primorsky No. 1 and No. 2 International Transport Corridors: Risk Evaluation and Mitigation Policies".SUSTAINABILITY 13.4(2021):24. |
入库方式: OAI收割
来源:地理科学与资源研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。