中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
A real-time prediction method for tunnel boring machine cutter-head torque using bidirectional long short-term memory networks optimized by multi-algorithm

文献类型:期刊论文

作者Huang, Xing1; Zhang, Quantai2; Liu, Quansheng2; Liu, Xuewei1; Liu, Bin1; Wang, Junjie3; Yin, Xin2
刊名JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING
出版日期2022-06-01
卷号14期号:3页码:798
关键词Tunnel boring machine (TBM) Real-time cutter-head torque prediction Bidirectional long short-term memory (BLSTM) Bayesian optimization Multi-algorithm fusion optimization Incremental learning
ISSN号1674-7755
英文摘要Based on data from the Jilin Water Diversion Tunnels from the Songhua River (China), an improved and real-time prediction method optimized by multi-algorithm for tunnel boring machine (TBM) cutter-head torque is presented. Firstly, a function excluding invalid and abnormal data is established to distinguish TBM operating state, and a feature selection method based on the SelectKBest algorithm is proposed. Accordingly, ten features that are most closely related to the cutter-head torque are selected as input variables, which, in descending order of influence, include the sum of motor torque, cutter-head power, sum of motor power, sum of motor current, advance rate, cutter-head pressure, total thrust force, penetration rate, cutter-head rotational velocity, and field penetration index. Secondly, a real-time cutter-head torque prediction model's structure is developed, based on the bidirectional long short-term memory (BLSTM) network integrating the dropout algorithm to prevent overfitting. Then, an algorithm to optimize hyperparameters of model based on Bayesian and cross-validation is proposed. Early stopping and checkpoint algorithms are integrated to optimize the training process. Finally, a BLSTM-based real-time cutter-head torque prediction model is developed, which fully utilizes the previous time-series tunneling information. The mean absolute percentage error (MAPE) of the model in the verification section is 7.3%, implying that the presented model is suitable for real-time cutter-head torque prediction. Furthermore, an incremental learning method based on the above base model is introduced to improve the adaptability of the model during the TBM tunneling. Comparison of the prediction performance between the base and incremental learning models in the same tunneling section shows that: (1) the MAPE of the predicted results of the BLSTM-based real-time cutter-head torque prediction model remains below 10%, and both the coefficient of determination (R-2) and correlation coefficient (r) between measured and predicted values exceed 0.95; and (2) the incremental learning method is suitable for realtime cutter-head torque prediction and can effectively improve the prediction accuracy and generalization capacity of the model during the excavation process. (C) 2022 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
学科主题Engineering
语种英语
WOS记录号WOS:000799668500011
出版者SCIENCE PRESS
源URL[http://119.78.100.198/handle/2S6PX9GI/35030]  
专题中科院武汉岩土力学所
作者单位1.State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, 430071, China
2.Key Laboratory of Geotechnical and Structural Engineering Safety of Hubei Province, School of Civil Engineering, Wuhan University, Wuhan, 430072, China
3.The 2nd Engineering Company of China Railway 12th Bureau Group, Taiyuan, 030032, China
推荐引用方式
GB/T 7714
Huang, Xing,Zhang, Quantai,Liu, Quansheng,et al. A real-time prediction method for tunnel boring machine cutter-head torque using bidirectional long short-term memory networks optimized by multi-algorithm[J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING,2022,14(3):798.
APA Huang, Xing.,Zhang, Quantai.,Liu, Quansheng.,Liu, Xuewei.,Liu, Bin.,...&Yin, Xin.(2022).A real-time prediction method for tunnel boring machine cutter-head torque using bidirectional long short-term memory networks optimized by multi-algorithm.JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING,14(3),798.
MLA Huang, Xing,et al."A real-time prediction method for tunnel boring machine cutter-head torque using bidirectional long short-term memory networks optimized by multi-algorithm".JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING 14.3(2022):798.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。