Development and in-situ application of a real-time cutting tool forces monitoring system in TBM tunnelling
文献类型:期刊论文
作者 | Huang, Xing1; Liu, Quansheng4; Liu, Bin1; Wang, Dongdong2; Wang, Xinyu4; Zeng, Chuigang3 |
刊名 | TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
![]() |
出版日期 | 2022-06-01 |
卷号 | 124期号:-页码:- |
关键词 | TBM Cutting tool forces Real-time monitoring system Remote control In-situ application |
ISSN号 | 0886-7798 |
英文摘要 | In order to determine the operational status of tunnel boring machines (TBMs), a real-time cutting tool force monitoring system is established based on the proposed cutting tool force measurement and calculation method. The monitoring system is composed of strain sensors, a data acquisition module, a data transmission module, and a data analysis module. The sensor layout and the complete monitoring system operating principle are presented. A dynamic rotary rock cutting test was carried out to verify the effectiveness of the proposed cutting tool force measurement method and corresponding monitoring system. Finally, the monitoring system was applied to the 'Colorful Clouds'-named TBM in the Gaoligongshan Tunnel (China). This monitoring system can provide continuous power supply, unattended automatic operation, and monitor error information feedback, thereby realizing real-time monitoring, remote control, and data sharing. The field monitoring results show that the cutter's maximum peak normal force and maximum peak side force appear every few seconds. Every two normal force peaks mark a complete penetration process. The maximum and minimum normal force peaks are approximately 800 kN and 50 kN, respectively, and the maximum normal force peak is approximately 6-7 times the peak side force. The normal force frequency indicates that the cutter's normal force is concentrated from 0 to 300 kN, accounting for approximately 95% of the overall proportion. |
学科主题 | Construction & Building Technology ; Engineering |
语种 | 英语 |
WOS记录号 | WOS:000793657600003 |
出版者 | PERGAMON-ELSEVIER SCIENCE LTD |
源URL | [http://119.78.100.198/handle/2S6PX9GI/35207] ![]() |
专题 | 中科院武汉岩土力学所 |
作者单位 | 1.State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China 2.School of Civil Engineering, Xinyang College, Xinyang, Henan 464000, China 3.State Key Laboratory of Shield Machine and Boring Technology, China Railway Tunnel Group Co., Ltd., Zhengzhou, Henan 450001, China 4.Key Laboratory of Geotechnical and Structural Engineering Safety of Hubei Province, School of Civil Engineering, Wuhan University, Wuhan, Hubei 430072, China |
推荐引用方式 GB/T 7714 | Huang, Xing,Liu, Quansheng,Liu, Bin,et al. Development and in-situ application of a real-time cutting tool forces monitoring system in TBM tunnelling[J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,2022,124(-):-. |
APA | Huang, Xing,Liu, Quansheng,Liu, Bin,Wang, Dongdong,Wang, Xinyu,&Zeng, Chuigang.(2022).Development and in-situ application of a real-time cutting tool forces monitoring system in TBM tunnelling.TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,124(-),-. |
MLA | Huang, Xing,et al."Development and in-situ application of a real-time cutting tool forces monitoring system in TBM tunnelling".TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY 124.-(2022):-. |
入库方式: OAI收割
来源:武汉岩土力学研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。