中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Study on the Influence of Water Level on Earth Dam Reinforced by Cut-Off Wall: A Case Study in Wujing Reservoir

文献类型:期刊论文

作者Liu, Da1,4; Lin, Taiqing1; Gao, Jianglin1; Xue, Binghan2; Yang, Jianhua3; Chen, Congxin4; Zhang, Weipeng3; Sun, Wenbin3
刊名WATER
出版日期2023
卷号15期号:1页码:-
关键词earth rock dam cut-off wall dam safety stability safety factor water level fluctuation deformation measurement cracks on dam crest
英文摘要The construction of a cut-off wall is a common reinforcement method for earth rock dams. At present, compared with the in-depth study on homogeneous earth dams, more and more attention is being paid to the stability and deformation of earth dams strengthened by a concrete cut-off wall. In this study, aiming at the Wujing project of the earth dam strengthened by cut-off wall, the influence of the water level rise and fall on the stability of the dam slope, the deformation of the dam body, and the crack width on dam crest were analyzed by numerical calculation and in situ measurement. The analysis results show that when the reservoir encounters a sudden drawdown, the safety factor of the dam slope decreases sharply. The faster the sudden drawdown, the faster the safety factor decreases. When the reservoir water level rises, the dam's horizontal displacement shifts to the upstream direction, and the change of horizontal displacement of the downstream slope is significantly larger than that at the measuring point of the upstream slope. The water level of the reservoir rises, and the surface of the dam body rises, and the fluctuation of settlement deformation shows that the upstream side is larger than the downstream side, especially during the period of abrupt change in the reservoir water level. The longitudinal cracks on the dam crest show a tendency of shrinkage when the reservoir water level rises, and opening decreases with the decrease of deformation gradient increment and increases with the increase of gradient increment.
学科主题Environmental Sciences & Ecology ; Water Resources
语种英语
出版者MDPI
WOS记录号WOS:000908757800001
源URL[http://119.78.100.198/handle/2S6PX9GI/35246]  
专题中科院武汉岩土力学所
作者单位1.Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China
2.School of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, China
3.School of Infrastructure Engineering, Nanchang University, Nanchang 330031, China
4.State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 330029, China
推荐引用方式
GB/T 7714
Liu, Da,Lin, Taiqing,Gao, Jianglin,et al. Study on the Influence of Water Level on Earth Dam Reinforced by Cut-Off Wall: A Case Study in Wujing Reservoir[J]. WATER,2023,15(1):-.
APA Liu, Da.,Lin, Taiqing.,Gao, Jianglin.,Xue, Binghan.,Yang, Jianhua.,...&Sun, Wenbin.(2023).Study on the Influence of Water Level on Earth Dam Reinforced by Cut-Off Wall: A Case Study in Wujing Reservoir.WATER,15(1),-.
MLA Liu, Da,et al."Study on the Influence of Water Level on Earth Dam Reinforced by Cut-Off Wall: A Case Study in Wujing Reservoir".WATER 15.1(2023):-.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。