中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Preventing clogging of debrining tubing in a gas storage salt cavern during construction

文献类型:期刊论文

作者Jiang, Tingting1; Cao, Dongling1; Xie, Dongzhou1,3; Liao, Youqiang3; He, Tao3; Wang, Duocai2
刊名GAS SCIENCE AND ENGINEERING
出版日期2024-03-01
卷号123页码:14
关键词Salt cavern gas storage Insoluble sediment Tubing clogging Drag coefficient Critical velocity
ISSN号2949-9097
DOI10.1016/j.jgsce.2024.205227
英文摘要Insoluble sediments may block the debrining inner tubing (DIT) in a salt cavern during construction. Most previous studies of this problem have simplified the sediment particles to spheres, which leads to significant errors in the predicted moving critical velocity of these sediment particles. In this paper, the morphological and hydraulic characteristics of sediments are quantitatively analyzed by a series of experiments. A model for calculating the minimum moving critical velocity of irregular sediment particles is established. Preventive measures for the clogging of DIT are proposed. Results show that the statistical mean values of sphericity and area circularity of sediments are 0.44 and 0.56, respectively. The moving critical velocity of sediments is much smaller than that of spherical particles of the same mass. The shape coefficient can characterize the drag coefficient of irregular sediment. Reasonable control of the minimum safe distance (MSD) between DIT and the sediment surface is an effective method to prevent DIT clogging. If the debrining rate is decreased from 200 to 20 m3/h, the MSD can be decreased from 2.49 m to 0.2 m, which can increase the debrining brine volumes and the working gas volume of the cavern. The MSD in the Jintan underground gas storage salt cavern can be optimized from 4 m to 0.9 m, which can increase the working gas volume of 2.734 million m3. Research results provide a technological reference for preventing clogging of DIT and the optimization of debrining parameters.
资助项目CRSRI Open Research Program[SN: CKWV2019736/KY] ; China Postdoctoral Science Foundation[BX20230407] ; Postdoctoral Fellowship Program of CPSF[GZC20232009]
WOS研究方向Energy & Fuels ; Engineering
语种英语
WOS记录号WOS:001202512000001
出版者ELSEVIER
源URL[http://119.78.100.198/handle/2S6PX9GI/41066]  
专题中科院武汉岩土力学所
通讯作者Xie, Dongzhou
作者单位1.Wuhan Univ Technol, Sch Resources & Environm Engn, Wuhan 430070, Peoples R China
2.PipeChina West East Gas Pipeline Co, Shanghai 200120, Peoples R China
3.Chinese Acad Sci, Inst Rock & Soil Mech, Wuhan 430071, Peoples R China
推荐引用方式
GB/T 7714
Jiang, Tingting,Cao, Dongling,Xie, Dongzhou,et al. Preventing clogging of debrining tubing in a gas storage salt cavern during construction[J]. GAS SCIENCE AND ENGINEERING,2024,123:14.
APA Jiang, Tingting,Cao, Dongling,Xie, Dongzhou,Liao, Youqiang,He, Tao,&Wang, Duocai.(2024).Preventing clogging of debrining tubing in a gas storage salt cavern during construction.GAS SCIENCE AND ENGINEERING,123,14.
MLA Jiang, Tingting,et al."Preventing clogging of debrining tubing in a gas storage salt cavern during construction".GAS SCIENCE AND ENGINEERING 123(2024):14.

入库方式: OAI收割

来源:武汉岩土力学研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。