Numerical simulation and field study on predicting wind-blown sand accumulation in sand mitigation measures of the Ganquan railway
文献类型:期刊论文
作者 | Huang, Shiguang1; Ma, Tao1; Jiang, Fuqiang1; Nie, Fei3; Wang, Xuedong3; Ma, Tiantian2 |
刊名 | FRONTIERS IN EARTH SCIENCE
![]() |
出版日期 | 2024-07-16 |
卷号 | 12页码:13 |
关键词 | windblown sand environmental monitoring Euler two-phase flow model sand accumulation calculation railway infrastructures |
DOI | 10.3389/feart.2024.1443030 |
英文摘要 | The accumulation of sand induced by wind poses a significant challenge to the safety and maintenance of railways in arid and desert regions. Accurate calculation and prediction of sand accumulation are crucial for ensuring continuous railway operation. This research is centered on the region significantly impacted by sand accumulation along the Ganquan Railway. Wind speed, wind direction, and sand carrying capacity data near this section were monitored. Using the collected wind speed, wind direction, and wind-sand flow density data, numerical simulations were conducted using the Computational Fluid Dynamics (CFD) method to predict the amount of sand accumulation within the sand mitigation measures of the Ganquan Railway. Monitoring results indicate that the dominant wind direction in spring and summer is due west, while in autumn and winter it is southwest, with an average wind speed of 12 m/s. A positive correlation was observed between wind-sand flow density and wind speed. The wind-sand flow density above 2 m was nearly zero, indicating that the wind-sand flow structure is concentrated within 2 m from the ground, with an average wind-sand flow density of 3.50x10-5 kg/m3. Through numerical simulation, the characteristics of the wind field and sand accumulation distribution within the calculation domain were determined. A relationship equation between sand accumulation mass and width over time was derived. Initially, the sand accumulation width increases uniformly and then stabilizes, while the sand accumulation mass rises uniformly to a plateau before in-creasing rapidly. From these findings, the optimal period for sand removal was identified as between 350 and 450 days after the sand mitigation measures are put into operation. |
资助项目 | Major research project of China Railway Engineering Design Consulting Group Co., LTD.[2022-3] ; Key Topics of Ganquan Railway Co., LTD.[GJNY-21-68] |
WOS研究方向 | Geology |
语种 | 英语 |
WOS记录号 | WOS:001279283600001 |
出版者 | FRONTIERS MEDIA SA |
源URL | [http://119.78.100.198/handle/2S6PX9GI/42061] ![]() |
专题 | 中科院武汉岩土力学所 |
通讯作者 | Ma, Tiantian |
作者单位 | 1.China Railway Engn Consulting Grp Co Ltd, Beijing, Peoples R China 2.Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan, Peoples R China 3.Guoneng Ganquan Railway Grp Co Ltd, Bayannur, Peoples R China |
推荐引用方式 GB/T 7714 | Huang, Shiguang,Ma, Tao,Jiang, Fuqiang,et al. Numerical simulation and field study on predicting wind-blown sand accumulation in sand mitigation measures of the Ganquan railway[J]. FRONTIERS IN EARTH SCIENCE,2024,12:13. |
APA | Huang, Shiguang,Ma, Tao,Jiang, Fuqiang,Nie, Fei,Wang, Xuedong,&Ma, Tiantian.(2024).Numerical simulation and field study on predicting wind-blown sand accumulation in sand mitigation measures of the Ganquan railway.FRONTIERS IN EARTH SCIENCE,12,13. |
MLA | Huang, Shiguang,et al."Numerical simulation and field study on predicting wind-blown sand accumulation in sand mitigation measures of the Ganquan railway".FRONTIERS IN EARTH SCIENCE 12(2024):13. |
入库方式: OAI收割
来源:武汉岩土力学研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。