Two-Stage Co-Optimization of a Park-Level Integrated Energy System Considering Grid Interaction

文献类型:期刊论文

作者Zheng, Lintao1,2,3; Wang, Jing4; Chen, Jiongcong1,2,3; Ye, Cantao1,2,3; Gong, Yulie1,2,3
刊名IEEE ACCESS
出版日期2023
卷号11页码:66400-66414
关键词Integrated energy system capacity configuration energy storage renewable energy
ISSN号2169-3536
DOI10.1109/ACCESS.2023.3290160
通讯作者Ye, Cantao(yect@ms.giec.ac.cn)
英文摘要Park-level integrated energy system has the potential to improve system efficiency and facilitate friendly interaction with the power grid. This paper proposes an integrated energy system for parks that harnesses wind, solar, and geothermal energy sources, alongside three types of energy storage: cold, heat, and electricity. A two-stage coordinated optimization method is proposed that considers both long-term system operation and short-term operation scheduling. The effectiveness of this method is compared with an actual case in Tianjin, and the results demonstrate that the capacity configuration optimized by the two-stage optimization method yields economic and energy-saving benefits under long-term operation. It also satisfies the requirement of near-zero external power load fluctuation or participates in peak shaving and valley filling on the grid side during operation. The proposed two-stage optimization method achieves optimal capacity under long-term operation and favorable interaction with the power grid during daytime scheduling, thereby reducing decision-making difficulties.
WOS关键词SUPPLY RELIABILITY ; POWER-GENERATION ; COMBINED HEAT ; HYBRID ; SOLAR ; DESIGN ; IMPACT ; MODEL ; COMPLEMENTARITY ; FLEXIBILITY
资助项目Key Science and Technology Project of China Southern Grid Company[090000KK52220020]
WOS研究方向Computer Science ; Engineering ; Telecommunications
语种英语
WOS记录号WOS:001025448700001
出版者IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
资助机构Key Science and Technology Project of China Southern Grid Company
源URL[http://ir.giec.ac.cn/handle/344007/39410]  
专题中国科学院广州能源研究所
通讯作者Ye, Cantao
作者单位1.Chinese Acad Sci, Guangzhou Inst Energy Convers, Guangzhou 501640, Peoples R China
2.Chinese Acad Sci, Key Lab Renewable Energy, Guangzhou 501640, Peoples R China
3.Guangdong Key Lab New & Renewable Energy Res, Dev & Applicat, Guangzhou 501640, Peoples R China
4.Shenzhen Power Supply Bur Co Ltd, Shenzhen 518020, Peoples R China
推荐引用方式
GB/T 7714
Zheng, Lintao,Wang, Jing,Chen, Jiongcong,et al. Two-Stage Co-Optimization of a Park-Level Integrated Energy System Considering Grid Interaction[J]. IEEE ACCESS,2023,11:66400-66414.
APA Zheng, Lintao,Wang, Jing,Chen, Jiongcong,Ye, Cantao,&Gong, Yulie.(2023).Two-Stage Co-Optimization of a Park-Level Integrated Energy System Considering Grid Interaction.IEEE ACCESS,11,66400-66414.
MLA Zheng, Lintao,et al."Two-Stage Co-Optimization of a Park-Level Integrated Energy System Considering Grid Interaction".IEEE ACCESS 11(2023):66400-66414.

入库方式: OAI收割

来源:广州能源研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。