安县晓坝镇震后新建场址主要岩土工程问题及对策
文献类型:期刊论文
作者 | 游勇![]() |
刊名 | 西南科技大学学报
![]() |
出版日期 | 2010 |
卷号 | 25期号:2页码:26-31 |
关键词 | 地震 岩土工程 软土地基 地基处理 安县晓坝镇 |
其他题名 | Post-quake Reconstruction-related Geotechnical Problems and Countermeasures in Xiaoba Town,Anxian County,Sichuan Province,China |
通讯作者 | 游勇 |
合作状况 | 国内 |
中文摘要 | 安县晓坝镇处于"5.12"汶川大地震极重灾区,受灾严重,不具备重建条件,需选址重建。在野外详细调查的基础上,通过现场勘查和室内试验,深入研究了晓坝镇灾后新建场址的主要岩土工程问题。研究表明,新建场址主要土层为粉质粘土和淤泥质土,属高压缩性软弱土;地下水埋深浅,对基础施工和地基土承载力影响大;建筑场地类别Ⅱ类,属抗震不利地段。提出了深层水泥土搅拌法和换填地基两种软基处理方案,以及加强地基基础抗震设计等措施。 |
英文摘要 | Xiaoba Town of Anxian County,almost totally destroyed in the Wenchuan earthquake,did not have the reconstruction conditions and need to site redevelop.In order to study reconstruction-related geotechnical problems in heavy quake-hit areas,taking Xiaoba town as an example,we studied the main geotechnical problems of its new site based on detailed field survey and laboratory test.The results show that the main reconstruction-related geotechnical problems of this site are as follows: bad physical and mechanical properties of ground soils;shallow groundwater level;and unfavorable seismic site.Focusing on those problems,we present two methods,namely deep mixing method and replacement of ground soil method,to treat the soft ground,and suggest strengthening seismic design of subsoil-foundation. |
学科主题 | 岩土力学 |
分类号 | TU42 |
资助信息 | 973计划项目(2008CB425803);中科院知识创新工程项目(KZCX2-YW-Q03-5) |
语种 | 中文 |
公开日期 | 2012-03-28 |
源URL | [http://192.168.143.20:8080/handle/131551/3863] ![]() |
专题 | 成都山地灾害与环境研究所_山地灾害与地表过程重点实验室 |
推荐引用方式 GB/T 7714 | 游勇. 安县晓坝镇震后新建场址主要岩土工程问题及对策[J]. 西南科技大学学报,2010,25(2):26-31. |
APA | 游勇.(2010).安县晓坝镇震后新建场址主要岩土工程问题及对策.西南科技大学学报,25(2),26-31. |
MLA | 游勇."安县晓坝镇震后新建场址主要岩土工程问题及对策".西南科技大学学报 25.2(2010):26-31. |
入库方式: OAI收割
来源:成都山地灾害与环境研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。