元谋侵蚀沟谷高投入开发治理及效益
文献类型:期刊论文
作者 | 高维森1; 张春华2; 沙毓仓2; 严俊华2 |
刊名 | 山地研究
![]() |
出版日期 | 1996 |
卷号 | 14期号:34页码:194-198 |
关键词 | 效益 小流域 开发治理 高投入 元谋 |
ISSN号 | 1000-002X |
其他题名 | EVALUATION OF BENEFIT OF EXPLOITING AND CONTROLLING OF ERODED GULLY BY HIGH-INPUT,IN YUANMOU |
通讯作者 | 高维森 |
合作状况 | 其它 |
中文摘要 | 元谋侵蚀沟谷高投入开发治理具有一次性投入高、收效快、效益高特点,经济内部收益率59 %,投资回收年限4.29a,经济效益费用比3.71;植被覆盖率由<15%提高到91%,土壤侵蚀模数由16381t/(km2·a)减少到<200t/(km2·a);流域的开发治理使住在沟口的居民安居乐业、108国道畅通. |
英文摘要 | Taken the exploitation and control of Ludouqing eroded gully, Yuanmou hot-dry valley,by high-input as example; analyses the benefits of the model as follows:1. Economic benefit is high, EIRR is 59%, ENPV is 30 ×104 yuan per ,EBCR is 3. 74, the time of returns on investment is 4. 08 years.2. The density of ground cover increased by 6 times, from less than 15 % to 91 %. The rate of erosion reduced by 97 %, from 16 381 t/(km2 ·a) before 1988 to less than 200 t/(km2·a) in 1994. The flood damage to the farmer who lived beside the mouth of Ludouqing eroded gully and 108 highway have been eliminated.3. The high benefits of the model increases confidence of exploitation & control of small watershed by farmers and society. The model is an excellence example for reforming the control of small watershed. |
学科主题 | F323.24 |
收录类别 | CSCD ; 北大中文核心 |
语种 | 中文 |
CSCD记录号 | CSCD:313021 |
公开日期 | 2010-08-09 |
源URL | [http://ir.imde.ac.cn/handle/131551/1306] ![]() |
专题 | 成都山地灾害与环境研究所_成都山地所知识仓储(2009年以前) |
作者单位 | 1.中国科学院水利部成都山地灾害与环境研究所 2.云南省农科院热带亚热带经济作物研究所 |
推荐引用方式 GB/T 7714 | 高维森,张春华,沙毓仓,等. 元谋侵蚀沟谷高投入开发治理及效益[J]. 山地研究,1996,14(34):194-198. |
APA | 高维森,张春华,沙毓仓,&严俊华.(1996).元谋侵蚀沟谷高投入开发治理及效益.山地研究,14(34),194-198. |
MLA | 高维森,et al."元谋侵蚀沟谷高投入开发治理及效益".山地研究 14.34(1996):194-198. |
入库方式: OAI收割
来源:成都山地灾害与环境研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。