Dynamic response and structural integrity of submerged floating tunnel due to hydrodynamic load and accidental load
文献类型:会议论文
作者 | Hong YS(洪友士)![]() ![]() |
出版日期 | 2010 |
会议名称 | 1st International Symposium on Archimedes Bridge (ISAB-2010) |
会议日期 | OCT 17-20, 2010 |
会议地点 | Qiandao Lake, PEOPLES R CHINA |
通讯作者邮箱 | hongys@imech.ac.cn |
关键词 | Submerged floating tunnel Hydrodynamic load Buoyancy-weight ratio Tension pile Seismic effect Corrosion fatigue Structural integrity Strength assessment |
中文摘要 | This paper generally describes the research advances on dynamical response and structural integrity of submerged floating tunnel (SFT) subjected to hydrodynamic load and accidental load, which were accomplished by a research team in the Institute of Mechanics, Chinese Academy of Sciences in recent years. By means of theoretic analysis, modeling, calculation and experimental investigation, the research team has achieved creative results in several aspects including: (1) ABB Selection and its environmental & geotechnical conditions for ABP design, (2) Dynamic characteristics of SFT due to wave and current loads, (3) Effects of SFT structural parameters on its dynamic response, (4) Geotechnical investigations and tension pile analysis, (5) Dynamic response of SFT due to seismic load and accidental load, (6) Effects of water and sea-water on high-cycle and very- high-cycle fatigue behavior for metallic materials, and (7) Design of ABP of Qiandao Lake and its structure analysis & strength assessment. |
收录类别 | CPCI-S ; EI |
会议网址 | http://dx.doi.org/10.1016/j.proeng.2010.08.006 |
会议录 | ISAB-2010 - FIRST INTERNATIONAL SYMPOSIUM ON ARCHIMEDES BRIDGE 丛书:Procedia Engineering Vol: 4 p. 35-50
![]() |
会议录出版者 | ELSEVIER SCIENCE BV, SARA BURGERHARTSTRAAT 25, PO BOX 211, 1000 AE AMSTERDAM, NETHERLANDS |
语种 | 英语 |
ISSN号 | 1877-7058 |
WOS记录号 | WOS:000287149600004 |
源URL | [http://dspace.imech.ac.cn/handle/311007/48737] ![]() |
专题 | 力学研究所_非线性力学国家重点实验室 |
推荐引用方式 GB/T 7714 | Hong YS,Ge F. Dynamic response and structural integrity of submerged floating tunnel due to hydrodynamic load and accidental load[C]. 见:1st International Symposium on Archimedes Bridge (ISAB-2010). Qiandao Lake, PEOPLES R CHINA. OCT 17-20, 2010.http://dx.doi.org/10.1016/j.proeng.2010.08.006. |
入库方式: OAI收割
来源:力学研究所
浏览0
下载0
收藏0
其他版本
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。