中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Medium-Term Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process under Demand Uncertainty

文献类型:会议论文

作者Ye, Y. ; Li, J. ; Li, Z. K. ; Tang, Q. H. ; Xiao, X. ; Floudas, C. A.
出版日期2013
会议名称23rd European Symposium on Computer Aided Process Engineering (ESCAPE)
会议日期JUN 09-12, 2013
会议地点Lappeenranta, FINLAND
关键词scheduling steelmaking continuous casting robust optimization two-stage stochastic programming ROBUST OPTIMIZATION APPROACH BATCH PLANT
页码571-576
中文摘要In this paper, we introduce robust optimization and stochastic programming strategies for addressing demand uncertainty in steelmaking continuous casting operations. Robust optimization framework was first employed to develop a deterministic robust counterpart optimization model and to guarantee that the production schedule be feasible for the varying demands. Then, a two-stage scenario based stochastic programming framework was studied for the scheduling of steelmaking and continuous operations under demand uncertainty. To make the resulting stochastic programming problem computationally tractable, a scenario reduction method has been applied to reduce the number of scenarios to a small set of representative realizations. Results from both the robust optimization and stochastic programming methods demonstrate robustness under demand uncertainty and the robust solution is slightly better than the stochastic solution.
收录类别CPCI
会议网址://WOS:000329495800096
会议录Lappeenranta, FINLAND
语种英语
源URL[http://ir.ipe.ac.cn/handle/122111/11281]  
专题过程工程研究所_研究所(批量导入)
推荐引用方式
GB/T 7714
Ye, Y.,Li, J.,Li, Z. K.,et al. Medium-Term Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process under Demand Uncertainty[C]. 见:23rd European Symposium on Computer Aided Process Engineering (ESCAPE). Lappeenranta, FINLAND. JUN 09-12, 2013.://WOS:000329495800096.

入库方式: OAI收割

来源:过程工程研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。