中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Formation and Treatment of Landslide Dams Emplaced During the 2008 Wenchuan Earthquake, Sichuan, China

文献类型:专著章节/文集论文

作者Peng Cui; Xiaoqing Chen
专著(文集)名Natural and Artificial Rockslide Dams, Lecture Notes in Earth 295 Sciences 133
其他责任者S.G. Evans et al. (eds.)
出版日期2011
出版者Springer-Verlag Berlin Heidelberg ; Springer-Verlag Berlin Heidelberg
出版地London New York ; London New York
出处页码295-321
关键词Structural Geology Physical Geography Environmental Monitoring/Analysis Structural Geology Physical Geography Environmental Monitoring/Analysis
出版者Springer-Verlag Berlin Heidelberg ; Springer-Verlag Berlin Heidelberg
出版地London New York ; London New York
关键词Structural Geology Physical Geography Environmental Monitoring/Analysis Structural Geology Physical Geography Environmental Monitoring/Analysis
英文摘要

The M8.0 Wenchuan earthquake of 12 May 2008 triggered over 20,000 landslides in the earthquake affected area of Longmenshan Mountain. It was a common phenomenon that large scale landslides blocked river channels. In total, 257 landslide-dams were identified by field investigation and remote sensing inspection. The dams were distributed in a belt along the rupture zone and in clusters along the river valleys. Emergency risk assessment was carried out due to the rise of water levels behind the dams and catastrophic outburst potential of the landslide-dammed lakes. Under the emergency circumstances, the dam height, dam composition and storage capacity of the landslide-dammed lake were used as indices of the dam’s risk of collapse. Four risk levels were assigned. By analyzing 21 landslide dams in detail, the results of risk assessment were obtained; 1 dam had an extremely high danger risk (Tangjiashan Lake), 7 dams had a high danger, 5 dams medium danger and 8 dams were of low danger. The case of the Tangjiashan rockslide dam that formed the largest landslide-dammed lake, is discussed in detailed. The scenarios analysed were for 20, 25, 33, and 50% of the dam failing, yielding, respectively, flood heights of 4.6, 5.1, 5.7, and 6.2 m, inundation areas of 3.35, 3.84, 4.22, and 4.65 km2, and discharges of 6,106, 7,397, 9,062, and 11,260 m3/s, at the Fujiang Bridge in Mianyang, the second largest city in Sichuan Province. The outcome of this analysis was used by emergency managers to plan downstream evacuations. Sluiceways were designed to lower water level of the dammed lakes and to reduce the risk of the outburst floods. Emergency mitigation operations for risk-elimination proved to be effective and successful. On the other hand, debris flows will be the dominating disaster process in future and will likely deposit masses of debris in river channels forming new dams in the coming 5–10 years. It is thus of prime importance to take measures and prevent debris flows from damming main rivers and posing new threats to downstream locations.

语种英语
源URL[http://ir.imde.ac.cn/handle/131551/7454]  
专题成都山地灾害与环境研究所_山地灾害与地表过程重点实验室
推荐引用方式
GB/T 7714
Peng Cui,Xiaoqing Chen. Formation and Treatment of Landslide Dams Emplaced During the 2008 Wenchuan Earthquake, Sichuan, China. Natural and Artificial Rockslide Dams, Lecture Notes in Earth 295 Sciences 133. London New York, London New York:Springer-Verlag Berlin Heidelberg, Springer-Verlag Berlin Heidelberg,2011:295-321.

入库方式: OAI收割

来源:成都山地灾害与环境研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。