中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
Improved Evaluation Method of Major Hazard Installations

文献类型:会议论文

作者Zhang Hailong; Liu Jinzhong
出版日期2011
会议名称2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011
会议日期August 7, 2011 - August 10, 2011
会议地点Beijing, China
关键词Emergency Emergency Plan Evaluation Hazardous Installation Influencing Factors
页码2123-2128
通讯作者zhanghailong@uao.ac.cn
英文摘要Combining major hazard installation with emergency plan, this paper proposes an improved evaluation model of major hazard installations. And we add influencing factors of emergency plan into the evaluation model. It is based on the data which is from some enterprise producing liquid chlorine and chlorethylene and works out the proposed model. Finally, we calculated and analyzed the damage, influenced range, loss of life and personal injury and economic loss. The calculation shows that the efficient emergency plan will reduce the accident possibility of major hazard installations.
收录类别EI
会议主办者IEEE Robotics and Automation Society; Beijing University of Technology; Kagawa University
会议网址http://2011.ieee-icma.org/Home/Home.aspx
会议录2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011
会议录出版者IEEE Computer Society
学科主题天文仪器、天文技术与数据
会议录出版地Piscataway, NJ 08855-1331, United States
语种英语
ISSN号2152-7431
ISBN号978-1-4244-8113-2
源URL[http://ir.xao.ac.cn/handle/45760611-7/398]  
专题新疆天文台_计算机技术室
新疆天文台_光学天文与技术应用研究室
通讯作者Zhang Hailong
推荐引用方式
GB/T 7714
Zhang Hailong,Liu Jinzhong. Improved Evaluation Method of Major Hazard Installations[C]. 见:2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011. Beijing, China. August 7, 2011 - August 10, 2011.http://2011.ieee-icma.org/Home/Home.aspx.

入库方式: OAI收割

来源:新疆天文台

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。