堰塞坝漫顶溃决过程与机理试验研究

文献类型:期刊论文

作者陈宁生; 胡桂胜; 邓明枫
刊名成都理工大学学报( 自然科学版)
出版日期2011
卷号38期号:3页码:359-365
关键词堰塞坝 溃决过程 溃决机理
其他题名Experimental study on the overtopping outburst process and mechanism of the barrier dam
通讯作者陈宁生
合作状况国内
中文摘要为了分析堰塞坝的溃决过程与机理,进行了堰塞坝漫顶溃决试验。结合堰塞坝的溃口扩展和溃决流量过程,将漫顶溃决过程分为最初的缓慢侵蚀阶段和之后的快速侵蚀阶段。在这个过程中,溃口在纵向上的扩展以陡坎侵蚀的方式推进,而横向上的扩展由土体坍滑失稳引起。坝体漫顶破坏属于冲刷破坏。通过分析陡坎后退过程、冲刷过程及其机理,认为冲刷过程包括土粒间剪切和孤粒搬运两个过程,土粒间剪切为搬运过程提供孤粒,而搬运过程为土粒间剪切提供作用空间。颗粒间剪切发生后,细颗粒随即被搬运,而粗颗粒多在溃口表层形成"拟混凝土"结构,阻碍陡坎下蚀。快速侵蚀阶段,随着流速、流量的增加,"拟混凝土"结构遭到破坏,溃口进一步发展。 
英文摘要In order to analyze the outburst process and its mechanism of a barrier dam,the authors carried out overtopping outburst experiment of the barrier dam.Combined with the development of the breach and outburst discharge,the overtopping outburst is divided into two processes: slow-erosion process ahead and quick-erosion process later.During these processes,the breach in the longitudinal way develops in the means of headcut erosion,while in the cross way through soil mass collapse.Overtopping outburst is a kind of erosion failure.By analyzing the process and mechanism of the headcut development and soil erosion,people can find that the erosion process includes the inter-particle shearing failure and particle transportation process.the inter-particle failure provides particles for transportation,and the particle transportation process produces an operation room for the inter-particle shearing failure.After the inter-particle shearing failure,the fine particles are carried away at once,and the coarse particles settle down on the surface of the breach and form "near-concrete" structure,preventing the headcut from incising vertically.During the quick-erosion process,with the increase of velocity and discharge,the "near-concrete" structure is destroyed,leading to the second development of breach.
分类号TV135
收录类别CSCD
资助信息“十一五”国家科技支撑计划项目(2008BAB42B06);四川省科技支撑计划(2008SZ0156)
语种中文
CSCD记录号CSCD:4234945
公开日期2015-02-02
源URL[http://ir.imde.ac.cn/handle/131551/7768]  
专题成都山地灾害与环境研究所_山地灾害与地表过程重点实验室
推荐引用方式
GB/T 7714
陈宁生,胡桂胜,邓明枫. 堰塞坝漫顶溃决过程与机理试验研究[J]. 成都理工大学学报( 自然科学版),2011,38(3):359-365.
APA 陈宁生,胡桂胜,&邓明枫.(2011).堰塞坝漫顶溃决过程与机理试验研究.成都理工大学学报( 自然科学版),38(3),359-365.
MLA 陈宁生,et al."堰塞坝漫顶溃决过程与机理试验研究".成都理工大学学报( 自然科学版) 38.3(2011):359-365.

入库方式: OAI收割

来源:成都山地灾害与环境研究所

浏览0
下载0
收藏0
其他版本

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。