中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
内容类型
发表日期
学科主题
筛选

浏览/检索结果: 共8条,第1-8条 帮助

条数/页: 排序方式:
Beam Instrumentation Performance During Commissioning of the ESS Normal Conducting LINAC 会议论文  OAI收割
Canada, 2023
作者:  
I.D. Kittelmann;  R.A. Baron;  E.C. Bergman;  E.M. Donegani;  V. Grishin
  |  收藏  |  浏览/下载:1/0  |  提交时间:2024/11/14
Beam Commissioning of Normal Conducting Part and Status of ESS Project 会议论文  OAI收割
England, 2022
作者:  
R. Miyamoto;  C. Amstutz;  S. Armanet;  R.A. Baron;  E.C. Bergman
  |  收藏  |  浏览/下载:30/0  |  提交时间:2023/01/05
Status of the Normal Conducting Linac at the European Spallation Source 会议论文  OAI收割
Thailand, 2022
作者:  
D.C. Plostinar;  C. Amstutz;  S. Armanet;  R.A. Baron;  E.C. Bergman
  |  收藏  |  浏览/下载:18/0  |  提交时间:2023/01/05
Initial Performance of the Beam Instrumentation for the ESS IS & LEBT 会议论文  OAI收割
Australia, 2019
作者:  
C.S. Derrez;  R.A. Baron;  R.E. Bebb;  E.C. Bergman;  I. Dolenc Kittelmann
  |  收藏  |  浏览/下载:35/0  |  提交时间:2019/08/06
First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport 会议论文  OAI收割
Australia, 2019
作者:  
E.M. Donegani;  M. Mansouri;  Y. Levinsen;  E. Laface;  H. Kocevar
  |  收藏  |  浏览/下载:45/0  |  提交时间:2019/08/06
Neutron Sensitive Beam Loss Monitoring System for the ESS Linac 会议论文  OAI收割
Sweden, 2019
作者:  
I. Dolenc Kittelmann;  F.S. Alves;  E.C. Bergman;  C.S. Derrez;  V. Grishin
  |  收藏  |  浏览/下载:19/0  |  提交时间:2021/05/25
Ionisation Chamber Based Beam Loss Monitoring System for the ESS Linac 会议论文  OAI收割
Sweden, 2019
作者:  
I. Dolenc Kittelmann;  F.S. Alves;  E.C. Bergman
  |  收藏  |  浏览/下载:19/0  |  提交时间:2021/05/25
The First Experience and Results of Beam Diagnostics Deployment at the ESS Accelerator 会议论文  OAI收割
Vancouver, BC, Canada, 2018
作者:  
V. Grishin;  E.C. Bergman;  B. Cheymol;  C.S. Derrez;  T.J. Grandsaert
  |  收藏  |  浏览/下载:20/0  |  提交时间:2018/12/21