中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
_filter
_filter
_filter
筛选

浏览/检索结果: 共24条,第1-10条 帮助

条数/页: 排序方式:
Performances of the Two First Single Spoke Prototypes for the MYRRHA Project 会议论文  OAI收割
USA, 2016
作者:  
D.Longuevergne;  J.-L.Biarrotte;  S.Blivet;  P.Duchesne;  G.Olry
  |  收藏  |  浏览/下载:18/0  |  提交时间:2017/11/02
Commissioning of the MAX 700 MHz Test Stand 会议论文  OAI收割
Proceedings of the 27th International Linear Accelerator Conference, Switzerland, 2014
作者:  
J.-L.Biarrotte;  F.Chatelet;  M.El Yakoubi;  N.Gandolfo;  C.Joly
收藏  |  浏览/下载:17/0  |  提交时间:2016/10/09
The MYRRHA Spoke Cryomodule Design 会议论文  OAI收割
Proceedings of the 27th International Linear Accelerator Conference, Switzerland, 2014
作者:  
H.Saugnac;  J.-L.Biarrotte;  S.Blivet;  P.Duchesne;  N.Gandolfo
收藏  |  浏览/下载:31/0  |  提交时间:2016/10/09
A Cold Tuner System With Mobile Plunger 会议论文  OAI收割
International Conference on RF Superconductivity 2013 16th, Paris, 2013
作者:  
D.Longuevergne;  S.Blivet;  S.Bousson;  N.Gandolfo;  G.Martinet
收藏  |  浏览/下载:24/0  |  提交时间:2016/07/06
HIGH ENERGY BEAM LINE DESIGN OF THE 600 MeV , 4 mA PROTON LINAC FOR THE MYRRHA FACILITY 会议论文  OAI收割
Proceedings of the second International Particle Accelerator Conference (IPAC 2011), Spain, 2011
作者:  
H.Saugnac
收藏  |  浏览/下载:15/0  |  提交时间:2016/06/21
SPIRAL2 Cryomodules: Status and First Tests Results 会议论文  OAI收割
Berlin, 2009
作者:  
G.Olry;  D.Longuevergne;  H.Saugnac
  |  收藏  |  浏览/下载:13/0  |  提交时间:2017/06/16
A Novel Frequency Tuning System Based on Movable Plunger for SPIRAL2 High-Beta Superconducting Quarter-Wave Resonator 会议论文  OAI收割
Proceedings of the 24th Linear Accelerator Conference, Canada, 2008
作者:  
D.Longuevergne;  S.Blivet;  G.Martinet;  G.Olry;  H.Saugnac
收藏  |  浏览/下载:11/0  |  提交时间:2016/10/09
RF and Cryogenic Tests of the First Beta 0.12 SPIRAL2 Cryomodule 会议论文  OAI收割
Proceedings of the 24th Linear Accelerator Conference, Canada, 2008
作者:  
H.Saugnac;  C.Commeaux;  C.Joly;  J.Lesrel
收藏  |  浏览/下载:13/0  |  提交时间:2016/10/09
Results of beta=0.12 quarter wave resonator for radioactive beams production at SPIRAL2 Facility 会议论文  OAI收割
China, 2007
作者:  
G.Martinet;  D.Longuevergne;  S.Blivet;  S.Bousson;  F.Chatelet
  |  收藏  |  浏览/下载:16/0  |  提交时间:2017/06/16
Status of the Cryomodules and Cavities Development for the SPIRAL2 Superconducting Linac 会议论文  OAI收割
China, 2007
作者:  
G.Olry;  S.Blivet;  N.Hammoudi;  D.Longuevergne;  F.Lutton
  |  收藏  |  浏览/下载:9/0  |  提交时间:2017/06/16