中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
机构
采集方式
内容类型
发表日期
学科主题
筛选

浏览/检索结果: 共9条,第1-9条 帮助

条数/页: 排序方式:
Commissioning Plan of the IFMIF-DONES Accelerator 会议论文  OAI收割
England, 2022
作者:  
I. Podadera;  A. Ibarra;  M. Weber
  |  收藏  |  浏览/下载:9/0  |  提交时间:2023/01/05
Validation of Two Re-Buncher Cavities under High Beam Loading for LIPAc 会议论文  OAI收割
Brazil, 2021
作者:  
D. Gavela;  I. Podadera;  F. Toral
  |  收藏  |  浏览/下载:7/0  |  提交时间:2022/01/18
The Accelerator System of IFMIF-DONES Multi-MW Facility 会议论文  OAI收割
Brazil, 2021
作者:  
I. Podadera;  A. Ibarra;  D. Jimenez-Rey;  J. Mollá;  C. Oliver
  |  收藏  |  浏览/下载:7/0  |  提交时间:2022/01/18
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT Line 会议论文  OAI收割
Brazil, 2021
作者:  
C. Oliver;  A. Ibarra;  J. Mollá;  I. Podadera;  R. Varela
  |  收藏  |  浏览/下载:6/0  |  提交时间:2022/01/18
Overview of LIPAc Beam Instrumentation for the Initial Accelerator Commissioning 会议论文  OAI收割
Sweden, 2019
作者:  
D. Jiménez-Rey;  J. Castellanos;  J.M. García;  D. Gavela;  A. Ibarra
  |  收藏  |  浏览/下载:9/0  |  提交时间:2021/05/25
Beam Diagnostics for the Multi-MW High Energy Beam Transport Line of DONES 会议论文  OAI收割
Sweden, 2019
作者:  
I. Podadera;  A. Ibarra;  D. Jiménez-Rey;  J. Mollá;  C. Oliver
  |  收藏  |  浏览/下载:15/0  |  提交时间:2021/05/25
Beam Commissioning of Beam Position and Phase Monitors for LIPAc 会议论文  OAI收割
Sweden, 2019
作者:  
I. Podadera;  D. Gavela;  A. Guirao;  D. Jiménez-Rey;  L.M. Martínez
  |  收藏  |  浏览/下载:12/0  |  提交时间:2021/05/25
Commissioning of the Lipac Medium Energy Beam Transport Line 会议论文  OAI收割
Vancouver, BC, Canada, 2018
作者:  
I. Podadera;  J. Castellanos;  J.M. García;  D. Gavela;  A. Ibarra
  |  收藏  |  浏览/下载:20/0  |  提交时间:2018/12/21
Beam Induced Fluorescence Measurements of 100 keV Deuterons in LIPAc Accelerator 会议论文  OAI收割
Vancouver, BC, Canada, 2018
作者:  
R. Varela;  A. Guirao;  L.M. Martínez;  J. Mollá;  I. Podadera
  |  收藏  |  浏览/下载:10/0  |  提交时间:2018/12/21