中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
首页
机构
成果
学者
登录
注册
登陆
×
验证码:
换一张
忘记密码?
记住我
×
校外用户登录
CAS IR Grid
机构
地质与地球物理研究所 [3]
地理科学与资源研究所 [2]
采集方式
OAI收割 [5]
内容类型
期刊论文 [4]
SCI/SSCI论文 [1]
发表日期
2024 [1]
2010 [2]
2004 [2]
学科主题
筛选
浏览/检索结果:
共5条,第1-5条
帮助
条数/页:
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
排序方式:
请选择
题名升序
题名降序
提交时间升序
提交时间降序
作者升序
作者降序
发表日期升序
发表日期降序
GGMNet: Pavement-Crack Detection Based on Global Context Awareness and Multi-Scale Fusion
期刊论文
OAI收割
REMOTE SENSING, 2024, 卷号: 16, 期号: 10, 页码: 1797
作者:
Wang, Yong
;
He, Zhenglong
;
Zeng, Xiangqiang
;
Zeng, Juncheng
;
Cen, Zongxi
  |  
收藏
  |  
浏览/下载:26/0
  |  
提交时间:2024/07/12
pavement cracks
deep learning
attention mechanism
graph reasoning
multi-scale features fusion
Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis
期刊论文
OAI收割
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 卷号: 69, 期号: 3, 页码: 333-342
作者:
Qi, Shengwen
;
Wu, Faquan
;
Zhou, Yuande
;
Song, Yuhuan
;
Gong, Manfu
  |  
收藏
  |  
浏览/下载:27/0
  |  
提交时间:2018/09/26
Deep seated deformation
Deep cracks
Slope
Stability analysis
Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis
期刊论文
OAI收割
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 卷号: 69, 期号: 3, 页码: 333-342
作者:
Qi, Shengwen
;
Wu, Faquan
;
Zhou, Yuande
;
Song, Yuhuan
;
Gong, Manfu
  |  
收藏
  |  
浏览/下载:26/0
  |  
提交时间:2018/09/26
Deep seated deformation
Deep cracks
Slope
Stability analysis
Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
期刊论文
OAI收割
ENGINEERING GEOLOGY, 2004, 卷号: 73, 期号: 1-2, 页码: 129-144
作者:
Qi, SW
;
Wu, FQ
;
Yan, FZ
;
Lan, HX
  |  
收藏
  |  
浏览/下载:17/0
  |  
提交时间:2018/09/26
Jinping First Stage Hydropower Station
Deep Cracks
Mechanism
Unload
Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
SCI/SSCI论文
OAI收割
2004
Qi S. W.
;
Wu F. Q.
;
Yan F. Z.
;
Lan H. X.
收藏
  |  
浏览/下载:23/0
  |  
提交时间:2012/06/08
Jinping first stage hydropower station
deep cracks
mechanism
unload