中国科学院机构知识库网格
Chinese Academy of Sciences Institutional Repositories Grid
首页
机构
成果
学者
登录
注册
登陆
×
验证码:
换一张
忘记密码?
记住我
×
校外用户登录
CAS IR Grid
机构
力学研究所 [2]
地质与地球物理研究所 [1]
长春光学精密机械与物... [1]
采集方式
OAI收割 [4]
内容类型
会议论文 [3]
期刊论文 [1]
发表日期
2020 [1]
2012 [1]
2011 [2]
学科主题
筛选
浏览/检索结果:
共4条,第1-4条
帮助
条数/页:
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
排序方式:
请选择
题名升序
题名降序
提交时间升序
提交时间降序
作者升序
作者降序
发表日期升序
发表日期降序
Analysis of Hydro-fracturing Technique Using Ultra-deep Boreholes for Coal Mining with Hard Roofs: a Case Study
期刊论文
OAI收割
MINING METALLURGY & EXPLORATION, 2020, 页码: 14
作者:
Zheng, Jianwei
;
Ju, Wenjun
;
Sun, Xiaodong
;
Jiang, Pengfei
;
Zheng, Yangfa
  |  
收藏
  |  
浏览/下载:36/0
  |  
提交时间:2020/12/07
Ultra-deep borehole hydro-fracturing technique
Hard roof
Strata spatial structure
Stress arch
Fracturing-before-injecting
Numerical simulation of geostress and support of roadway crossing strata in complex stress condition
会议论文
OAI收割
2nd International Conference on Structures and Building Materials, ICSBM 2012, Hangzhou, China, MAR 09-11, 2012
作者:
Liu Y
;
Liu Y
;
Liu Y
;
Liu Y
;
Liu Y
收藏
  |  
浏览/下载:26/0
  |  
提交时间:2013/02/26
Building materials
Civil engineering
Coal deposits
Coal mines
Lie groups
Roof coverings
Coal seams
Complex stress
Complex stress condition
Geo-stress
Mining areas
Numerical simulation software
research methods
Roof structure detection
Roof structures
Stability Classification
Stress variations
Surrounding rock
Video detection
Working face
Zone charts
The structure design and analysis of predigest laser combine bind and extend bind flat roof (EI CONFERENCE)
会议论文
OAI收割
2011 International Conference on Advanced Engineering Materials and Technology, AEMT 2011, July 29, 2011 - July 31, 2011, Sanya, China
作者:
Wang B.
;
Wang H.
;
Wang H.
;
Wang H.
;
Wang H.
收藏
  |  
浏览/下载:31/0
  |  
提交时间:2013/03/25
This paper put forward a kind of predigest laser combine bind and extend bind flat roof structure
which is founded as fission flat roof
and can be built in an little room 1280mm990mm815mm. This flat roof space location can be adjusted. This kind of seat can ensure the system complete laser combine and close as high precision. In this paper we designed the laser combine and close whole structure and install design. At last we did some finite statics analysis to some important parts. This design can ensure every laser fire directional adjust mete lower 30'
and the flat roof quality is 770kg. The transition benchmark flat roof system most meet and emergency is 0.005mm at the premise of bear the weight of turn flat laden. It can be seen that this structure can satisfy the request of many lasers small space laser extend bind and adjust. This kind can be extended to other light combine bind and extend bind structure design. (2011) Trans Tech Publications
Switzerland.
Study on the Structural System of Roof in Fully Mechanized Top Coal Caving
会议论文
OAI收割
International Conference on Civil Engineering and Transportation (ICCET 2011), Jinan, PEOPLES R CHINA, OCT 14-16, 2011
作者:
Shen J
;
Meng D(孟达)
收藏
  |  
浏览/下载:23/0
  |  
提交时间:2012/09/25
Fully Mechanized Top-Coal Caving
Roof Structure
Structural System
Underground Mining